SCP-1892
Safe
~
medium confidence
SCP-1892
Expected annual
$2.3M
One-time setup
$1.5M
Annual recurring
$2.2M
Personnel
12
One-time startup capital is approximately $1,484,000 driven primarily by facility purchase, retrofits, contingency fund and vehicle/IT purchases. Recurring annual operating costs are about $2,247,000/yr, driven mainly by personnel (security and research/medical staff), D-Class procurement, and ongoing research/medical services.
One-Time Capital Costs
Total: $1.5M
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Routine year with no major incidents; standard testing tempo (24 D-Class/year) and normal operations.
normal_testing_tempo
no_breaches
standard_maintenance
🚨
Minor Incident
$2.4M/yr
Localized incident requiring incident response, repairs, temporary overtime, and modest cover-up/legal payments.
localized_breach
civilian_sighting
equipment_tampering
🚨
Major Breach
$3.4M/yr
Significant containment breach or public exposure requiring major emergency operations, possible facility repairs or relocation, large-scale legal/cover operations.
major_containment_breach
widespread_media_exposure
legal_action
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 3 | [#5] Three cover agents required to patrol property (no fewer than three agents). |
| Site Supervisor / Incident Response | 2 | [#6] Two higher-clearance Foundation staff for monitoring and incident response. |
| Research Scientist (PI) | 1 | [#7] Principal investigator leading testing and studies. |
| Research Psychiatrist | 2 | [#7] Two psychiatrists for testing and clinical assessments. |
| Neurologist | 1 | [#7] Neurologist for neuroimaging interpretation and assessments. |
| Research Technician | 2 | [#7] Two research techs to support testing and data collection. |
| Medical Officer / Nurse | 1 | [#7] Nursing support for pre/post-test care and emergency response. |
Confidence Notes
Estimates are derived directly from analyst line-item assumptions but rely on operational assumptions (D-Class tempo, local property prices, staffing overhead). Reasonable detail exists for major line items but many values are order-of-magnitude estimates and could vary significantly by location and testing intensity.