SCP-1898 Safe ~ medium confidence
SCP-1898
Expected annual
$3.0M
One-time setup
$1.9M
Annual recurring
$3.0M
Personnel
12
Initial program setup is moderately capital-intensive (~$1.68M one-time) for containment build-outs and specialized equipment; annual operating costs are substantial (~$2.98M/yr) driven by staffing, MTF readiness, secure storage/logistics, and specialist research.
🏗️ One-Time Capital Costs Total: $1.9M
Facilities $1.1M
[#1, #9] Room-1898 secure build-out (reinforced walls, cabinetry, access control) plus option to construct a dedicated hangar for Large-set storage (aggregate midpoint of provided ranges).
Equipment $430K
[#2, #3, #5, #6, #11, #15, #23] Initial purchase and fabrication: custom crates and packing solutions, inventory/barcode hardware and software, CCTV/access-control install, initial MTF kit/equipment, 3D scanning hardware, PPE initial kit, and secure IT/server hardware.
Mtf Initial Kit $200K
[#6] One-time specialized MTF rapid-response kit, vehicles and deployment equipment (initial provisioning distinct from annual readiness).
Initial Research And Lab Setup $100K
[#10] Laboratory testing and observation suite build-out (workbenches, observation cameras, soundproofing and controlled-test fixtures).
It Initial Deployment $40K
[#3, #23] Secure servers, encrypted backups and initial IT infrastructure for archival and experimental data.
Ppe Initial Purchase $20K
[#15] Initial PPE, harnesses, signage and worker-safety equipment for construction/tests.
🔄 Annual Recurring Costs Total: $3.0M/yr
Staff Wages $980K/yr
[#4, #12, #14] Security staffing for 24/7 coverage and specialist research/medical salaries (guards, mathematicians/topologists/engineers, on-call medic).
Mtf Readiness $500K/yr
[#6] Annual MTF PI-31 readiness: training, exercises, replacement equipment and standing operational capability.
Cover Story And Legal $165K/yr
[#17, #18, #25] Public-relations/cover-up actions, legal liaison, property acquisition budgets and amnestic program allocations aggregated.
Logistics And Transport $160K/yr
[#7, #8, #16, #26] Routine retrievals, transport containers, and average annualized cost of occasional heavy-equipment mobilizations and controlled reassembly events.
Contingency Reserve $150K/yr
[#27] Program reserve for anomalous escalation, emergency containment upgrades or unexpected medical crises (10-25% suggested reserve).
External Storage Rent $125K/yr
[#9] If external warehouse is used rather than constructing a hangar: climate- and pest-controlled storage rental averaged annually.
Research And Monitoring $100K/yr
[#10, #11, #13] Lab operations, per-test staffing/observation costs and baseline imaging/testing operations (does not double-count listed specialist salaries).
Controlled Test Construction $100K/yr
[#16] Average annual spend on controlled reconstruction tests of Large sets (scaffolding, operators, temporary structures) averaged over time.
Facilities Maintenance $75K/yr
[#1, #9] Ongoing maintenance, utilities and upkeep for Containment Room-1898 and any dedicated hangar/storage.
Insurance And Contingency $75K/yr
[#22] Insurance premiums and contingency fund (estimated as a percent of program operating budget).
Retrievals Small Medium $60K/yr
[#7] Expected annual cost of domestic small/medium recoveries (travel, local security, containers averaged over year).
Large Set Retrievals Avg Annual $50K/yr
[#8] Annualized budget for occasional large-set heavy-equipment retrievals (averaged per year).
Pr Coverup And Legal Liaison $50K/yr
[#17] Liaison with local authorities, PR and legal costs for managing discovered public structures and witnesses.
Demolition And Remediation $50K/yr
[#20] Budget for property seizure, demolition permitting and remediation averaged across years (per-incident costs are much higher when they occur).
Long Term Archival Storage $50K/yr
[#21] Conservation, climate control and specialist archival care for high-priority objects.
Acquisitions Budget $50K/yr
[#25] Budget to acquire discovered artworks/properties or compensate owners to avoid exposure.
Demobilization And Reassembly $50K/yr
[#26] Skilled crew costs for careful disassembly/re-boxing of Large-set components and periodic re-inspection.
Structural Engineering Monitoring $30K/yr
[#13] Ongoing structural review budget and occasional per-structure certification monitoring.
Medical Monitoring And Personnel Safety $25K/yr
[#14] Per-test medical screening/monitoring, psychological screening consumables and on-site medic consumables (salary accounted in staff_wages).
Supplies And Consumables $20K/yr
[#15, #19] Consumables including PPE replenishment, small maintenance supplies and per-artifact consumables for evidence processing.
Evidence Processing $20K/yr
[#19] Forensic cataloging, labelling and archival/destruction processing per-item averaged across expected throughput.
Training And Certification $20K/yr
[#24] Regular staff training, tabletop exercises and certification maintenance.
Electronic Security Maintenance $15K/yr
[#5] CCTV, access control and intrusion-detection service/monitoring costs.
Amnestic Operations $15K/yr
[#18] Class-B amnestic procurement, administration and small-scale operations averaged per year.
Packing Crates Replacements $10K/yr
[#2] Ongoing replacement and fabrication of tamper-evident and oversized crates for deconstructed components.
It Storage And Maintenance $10K/yr
[#23] Ongoing secure backups, encrypted storage and IT operations for large 3D model datasets and logs.
Research Archive Publication $10K/yr
[#28] Staff time for secure test logs, redacted publications and archival documentation.
Inventory System Maintenance $5K/yr
[#3] Software maintenance, RFID/barcode tag replacements and handheld scanner upkeep.
Ppe Replenishment $5K/yr
[#15] Annual replenishment of PPE and safety gear.
Imaging Software Licenses $3K/yr
[#11] Licenses and software maintenance for LiDAR/photogrammetry and post-processing tools.
Cost Scenarios
📊 Baseline (baseline) $3.0M/yr
88.0% probability / year
Normal uneventful year with routine retrievals, scheduled testing, and no major large-set incidents.
routine_retrievals scheduled_testing no_large_set_incidents
🚨 Minor Incident $3.1M/yr
10.0% probability / year +$75K vs baseline
One or more small/medium retrievals requiring additional PR/amnestic action, minor legal costs, or unplanned engineering reviews.
public_witnesses small_retrievals_with_media additional_engineering_review
🚨 Major Large Set Retrieval $4.1M/yr
2.0% probability / year +$1.1M vs baseline
Recovery and controlled testing or demolition of a Large-set (SCP-1898-C) requiring heavy equipment, major structural engineering, legal/acquisition and possible remediation.
large_set_discovery urban_heavy_lift_and_permits controlled_construction_and_testing
👥 Personnel 12 total
Role Count Notes
Security Officer / MTF Agent 8 Dedicated guards for Site-1898 area providing 24/7 coverage and access control; salary estimates included in staff_wages. [#4]
Research Scientist 3 Mathematicians/topologists/engineers responsible for analysis, testing oversight and design of safe experiments; senior specialist salaries included in staff_wages. [#12]
Medical Officer 1 On-call medic for experiments and participant monitoring; salary included in staff_wages and medical consumables in recurring expenses. [#14]
📋 Confidence Notes
Ranges in the analyst notes are broad for many line items (especially large-set operations and MTF readiness), requiring assumptions about frequency and scale; allocations use mid-range estimates and conservative annualization but uncertainties remain.
← SCP-1897 ↑ All SCPs SCP-1899 →