SCP-1908
Unknown
~
medium confidence
SCP-1908
Expected annual
$2.1M
One-time setup
$4.0M
Annual recurring
$2.0M
Personnel
9
Initial capital costs are dominated by constructing an isolated waterproof containment cell, plumbing/neutralization systems, and secure AI/media archive; annual operating costs are driven primarily by personnel (security, research, memetic safety) and ongoing research/AI upkeep.
One-Time Capital Costs
Total: $4.0M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal year of operations with no major incidents; routine maintenance, personnel, research, and containment operations proceed as planned.
routine_operations
no_exposure_events
🚨
Minor Incident
$2.2M/yr
Single accidental exposure or small containment leak requiring medical treatment, targeted legal/PR response, increased disposal and forensic costs.
accidental_viewing
single_person_exposure
localized_leak_or_spill
🚨
Major Breach
$4.0M/yr
Significant containment breach or public exposure leading to multiple exposures, large-scale medical response, legal action, and possible decommissioning/neutralization efforts.
public_exposure
mass_exposure
decision_to_decommission
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#9] Dedicated guards for Hall 34-B (2 per shift overlap / 24/7 coverage; represented as ~4 FTEs). |
| Research Scientist | 1 | [#10] Senior containment researcher (e.g., Dr. Everwood) — full-time. |
| Containment Technician | 2 | [#10] Containment technicians for maintenance, sample handling, and routine operations. |
| AI Operator | 1 | [#6, #10] NOUS.AIC operator responsible for oversight, redaction approvals, and safe workflow management. |
| Memetic Safety Officer | 1 | [#11] Specialist responsible for memetic risk assessment, approvals, and human-in-loop safeguards. |
Confidence Notes
Line items are well-specified with ranges, allowing mid-point estimates; uncertainty remains due to low-frequency high-cost events (decommissioning, major breaches) and variability in staffing/contracting costs.