SCP-1911
Euclid
~
medium confidence
SCP-1911
Expected annual
$1.5M
One-time setup
$1.1M
Annual recurring
$1.5M
Personnel
15
Initial one-time setup ~ $1.05M for a secured residential containment suite, research setup, and vehicles/equipment; recurring annual costs ~ $1.47M driven primarily by security and research/staff wages, plus large contingency reserves.
One-Time Capital Costs
Total: $1.1M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal year with ongoing containment and no major incidents.
no new infestations
regular research and maintenance
routine operations
🚨
Minor Incident
$1.5M/yr
Single, localized containment incident requiring a rapid response and limited additional cleanup.
attempted forcible entry
small emergency medical event
evidence processing after a discovered infestation
🚨
Major Breach
$2.5M/yr
Major containment breach requiring multi-team MTF deployment, extended relocation and large remediation operations.
target escapes or large-scale infestation
extended multi-site operation
mass evidence decontamination
🚨
Political Exposure
$3.5M/yr
Significant public exposure or litigation requiring large legal/PR expenditures and possible settlements.
media leak
local authority/legal action
high-profile casualty
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#3] 6–8 full-time guards + 1 supervisor approximated as 7 FTE for budgeting. |
| Research Scientist | 2 | [#5] Two researchers assigned to audio/behavioral/genomic analysis. |
| Engineer / Lab Technician | 1 | [#5] One technician for equipment, sample handling and experiments. |
| Medical Officer / Nurse | 1 | [#4] Full-time nurse/medic for everyday care and emergencies. |
| Psychiatrist / Psychologist | 1 | [#4] Part-time or PT-equivalent psychiatrist approximated as 1 FTE for staffing and budgeting. |
| Administrative Staff / Archivist | 1 | [#14, #6] Clerk/archivist to manage documentation, cataloging and evidence records. |
| Driver / Logistics | 1 | [#9] Vehicle operator/logistics support for transports and field response. |
Confidence Notes
Estimates derive from analyst-provided ranges; many items have wide ranges and depend on local construction/security costs and unknown breach frequency. Reasonable midpoints were used but actual costs could vary (low-to-high) substantially if multiple simultaneous infestations occur.