SCP-1919
Euclid
~
medium confidence
SCP-1919
Expected annual
$24.3M
One-time setup
$22.9M
Annual recurring
$23.2M
Personnel
163
Initial capital expenditures ~ $23M dominated by land/control and facility/equipment build-out; annual operating costs ~ $23.16M driven primarily by security staffing, specialist research staff, medical/care liabilities, and legal/cover operations.
One-Time Capital Costs
Total: $22.9M
Annual Recurring Costs
Total: $23.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$23.2M/yr
Normal, uneventful year with standard operations and no major incidents.
routine_operations
scheduled_research
no_breaches
🚨
Minor Incident
$24.4M/yr
Limited breach or cluster of exposures requiring medical treatment, targeted repairs, and legal response.
limited_breach
several_injuries
localized_structural_damage
🚨
Major Breach
$73.2M/yr
Large-scale containment failure or political exposure requiring evacuation, large repairs, legal settlements, and major research/containment escalation.
mass_breach
mass_evacuation
political_exposure
Personnel
163 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 115 | [#1] Perimeter armed patrolmen across shifts (3–4x coverage to provide 24/7 staffing). |
| Shift Supervisor / Command Staff | 12 | [#4] Sergeants, site commander, ops staff, and administrative scheduling/background checks. |
| Research Scientist / Specialist | 12 | [#29] Multidisciplinary research team (chemists, ethologists, lead researchers). |
| Medical Officer / Trauma Medic | 8 | [#14, #17] On-site trauma medics, standby surgical/medical staff for extraction and long-term care support. |
| Engineer / Maintenance | 6 | [#3, #10, #11] Vehicle, generator, structural, and facility maintenance staff. |
| Drone Operator / Robotics Technician | 3 | [#12, #13] Remote reconnaissance/robotics operators and drone pilots. |
| Administrative Staff | 6 | [#4, #8, #21] Payroll, legal liaison, site admin, and public coordination support. |
| Site Director / Executive Staff | 1 | [#4] Senior site leadership and executive oversight. |
Confidence Notes
Many line items have wide ranges driven by location (land acquisition), required biosafety level (BSL-3 vs BSL-4), and political/legal uncertainty; staffing and equipment costs are better-defined, but major-event frequencies and scale remain uncertain.