SCP-1928
Safe
~
medium confidence
SCP-1928
Expected annual
$132K
One-time setup
$333K
Annual recurring
$129K
Personnel
1.1
One-time setup (airtight archival housing, monitoring, and contingency reserves) dominate initial costs (~$333k); recurring annual costs are modest (~$129k/yr) driven by fractional staff allocation, research/testing, security, and monitoring.
One-Time Capital Costs
Total: $333K
Annual Recurring Costs
Total: $129K/yr
Cost Scenarios
📊
Baseline
(baseline)
$129K/yr
Normal uneventful year with scheduled maintenance, monitoring, and occasional testing within typical parameters.
routine checks
planned testing
no containment incidents
🚨
Minor Incident
$139K/yr
Small containment incident or medical event requiring extra medical response, minor repairs, and limited investigation.
unexpected activation during handling
minor injury during a test
localized equipment repair
🚨
Major Breach
$204K/yr
Significant containment breach or incident requiring outside contractors, contingency spending, temporary isolation upgrades, and legal/compensation costs.
unauthorized access or significant alarm event
incident causing injury or property damage
🚨
Research Breakthrough Requiring Scale Up
$329K/yr
Discovery of additional hazardous or complex properties (memetic/auditory effects) leading to major upgrades: hermetic isolation, remote manipulators, expanded monitoring and specialized medical research.
unexpected escalation in anomalous behavior
evidence of broader memetic or sensory effects
decision to scale containment/research
Personnel
1.1 total
| Role | Count | Notes |
|---|---|---|
| Assigned Custodian / Curator | 0.1 | [#7] Pro-rated FTE (0.05-0.1 FTE) responsible for routine checks, paperwork and scheduling; salary pro-rated into staff_wages. |
| Security Officer / MTF Agent (allocated share) | 0.5 | [#8] Fractional allocation of onsite security staffing/rapid response represented as pro-rated share of an officer's time/salary. |
| Research Scientist / Test Supervisor (allocated) | 0.5 | [#9] Pro-rated research staff time for experiment design, supervision and documentation (fractional FTE equivalent). |
Confidence Notes
Notes are specific and many line items have recommended ranges; choices above use midpoints and conservative assumptions (e.g., one secure transfer/year, one experimental series/year). Uncertainty arises from unclear testing frequency, per-test costs variability, and speculative upgrade scenarios.