SCP-193
Safe
~
medium confidence
SCP-193
Expected annual
$511K
One-time setup
$490K
Annual recurring
$499K
Personnel
2.7
One-time capital costs are moderate (~$0.49M) driven by HVAC isolation, analytic instrument choices, and specialized containment equipment; recurring annual costs are significant (~$0.50M/yr) driven primarily by personnel, research/analytic work, medical monitoring, disposal, and contingency reserves.
One-Time Capital Costs
Total: $490K
Annual Recurring Costs
Total: $499K/yr
Cost Scenarios
📊
Baseline
(baseline)
$499K/yr
Normal year with scheduled operations, routine research, and no major incidents.
routine handling and weekly feeding
scheduled research and maintenance
🚨
Minor Incident
$524K/yr
Small accidental exposure or containment lapse requiring medical follow-up, extra disposal, overtime and limited remediation.
accidental contact during handling
PPE failure or transfer leak
🚨
Major Breach
$999K/yr
Significant containment breach or exposure event leading to hospitalizations, environmental remediation, legal/PR response and replacement of equipment.
large-scale exposure / hospitalization
incinerator/emissions incident or failed containment
🚨
Research Breakthrough Requiring Scale Up
$799K/yr
Research identifies mechanisms requiring larger-scale experiments, new in-house instrumentation, and expanded staffing/facilities.
successful lead experiment
decision to build in-house sequencing/analytical capacity
Personnel
2.7 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 1 | Senior researcher responsible for molecular/physiological studies (~$120,000/yr included in staff_wages). |
| Lab Technician | 1 | Full-time technician for daily removal/incineration, feeding, monitoring (~$60,000/yr included in staff_wages). |
| Security Officer / MTF Agent (overlay) | 0.5 | Fractional security allocation for escorts/overlay and containment checks (~$20,000/yr allocated). |
| Consultant (toxicologist / gas chemist) | 0.2 | Part-time external consultant allocation (~$20,000/yr included in staff_wages/external_contract_research). |
Confidence Notes
Many line items have wide ranges (especially instrumentation, incinerator vs contract disposal, and liability reserves). Staff and consumable estimates are better-constrained; overall program cost is moderately certain but could vary substantially depending on in-house instrument choices and contingency events.