SCP-1938
Safe
~
medium confidence
SCP-1938
Expected annual
$475K
One-time setup
$545K
Annual recurring
$472K
Personnel
4
Upfront one-time containment and research setup is moderate (~$545k) while annual operations are dominated by personnel, security, legal/PR, and contingency (~$472k/yr). Main drivers are staff wages (tech + guards), consultant retainers, and reserves for legal/incident response.
One-Time Capital Costs
Total: $545K
Annual Recurring Costs
Total: $472K/yr
Cost Scenarios
📊
Baseline
(baseline)
$472K/yr
Normal uneventful year with routine monitoring, training, and no contamination or public incidents.
no contamination events
no public exposure
routine operations
🚨
Minor Incident
$512K/yr
Accidental introduction of foreign aquatic life leading to conversion to SCP-1938-2, requiring containment reset (drain/refill), limited medical follow-ups, sequencing and PR/legal response.
unauthorized organism introduced
single drain/reset event
small number of exposed users
🚨
Major Incident
$622K/yr
Larger containment/operational failure or multiple contamination/exposure events requiring extended crisis response, equipment replacement, broad medical/psych support, and intensive PR/legal action.
multiple contamination events
extended multi-user exposures
replacement of equipment
🚨
Political Exposure
$546K/yr
External witness or media/legal exposure requiring aggressive cover-story operations, legal settlements, and long-term mitigation.
external witness/public leak
inspection or legal action
media attention
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician / Researcher | 1 | [#7] Full-time skilled technician responsible for daily checks, sensor reads, access control, and sample logging. |
| Security Officer / MTF Agent | 3 | [#8] Baseline continuous security coverage (3 guards, single coverage per shift) included in staffing costs. |
Confidence Notes
Estimates are mid-range selections from analyst ranges and incorporate many uncertain variables (incident frequency, legal/PR posture, and research scale). Physical containment and staff costs are better defined; research/project and legal contingencies carry greater uncertainty.