SCP-1979
Safe
~
medium confidence
SCP-1979
Expected annual
$3.7M
One-time setup
$4.1M
Annual recurring
$3.4M
Personnel
16
Estimated one-time capital of approximately $3.96M driven primarily by contingency/insurance reserves and off-site control buildout; recurring costs run about $3.39M/yr driven by continuous staffing, fuel/maintenance, security and logistics.
One-Time Capital Costs
Total: $4.1M
Annual Recurring Costs
Total: $3.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.4M/yr
Normal uneventful year with continuous operation and routine maintenance only.
continuous_operation
routine_maintenance
🚨
Minor Incident
$3.6M/yr
Local mechanical failure or short outage requiring expedited repairs, overtime, and expedited shipping of parts.
mechanical_failure
expedited_parts
overtime_repairs
🚨
Major Breach
$4.9M/yr
Prolonged downtime or user error leads to field expansion requiring emergency response, remediation, replacements and public cover-up actions.
prolonged_downtime
field_expansion
emergency_response
🚨
Catastrophic Breach
$6.9M/yr
Severe interface event causes third-party infrastructure damage or widespread contamination requiring large-scale remediation and liability payments.
large_field_expansion
third_party_damage
major_remediation
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Operators / Runners | 10 | [#6] Continuous-use personnel to meet '55 minutes out of every hour' requirement (rotating shifts). |
| Mechanic / Maintenance | 3 | [#7] Skilled mechanics on rotation / rapid on-call response for treadmill repairs. |
| Medical Officer | 3 | [#12] On-site medics and on-call physician coverage for continuous operator health monitoring. |
Confidence Notes
Mid-level confidence: analyst notes provide ranges for most line items and clear operational requirements (continuous staffing, redundancy), but many contingency/insurance/reserve choices and remote-site premiums are judgment calls.