SCP-199
Plant
~
medium confidence
SCP-199
Expected annual
$6.3M
One-time setup
$3.9M
Annual recurring
$5.8M
Personnel
11
Initial setup is a few-million-dollar program dominated by containment engineering, communications/RF monitoring infrastructure, and an incident response seed fund; annual operations are multi-million-dollar driven by field response teams, legal/cover costs, and ongoing research/monitoring.
One-Time Capital Costs
Total: $3.9M
Annual Recurring Costs
Total: $5.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.8M/yr
Normal operational year with no major incidents; routine field removals and program activity.
routine_field_removals
scheduled_research
routine_maintenance
🚨
Minor Incident
$6.1M/yr
Localized urban outbreak requiring expanded field response and small liability/cleanup costs.
single-city_patch
localized_release
minor_public_exposure
🚨
Major Breach
$9.8M/yr
Multi-site outbreak or high-severity release requiring major emergency response, scaling field teams and significant liability payouts.
multi-city_patches
mass_release
variant_behavior
🚨
Catastrophic Breach
$25.8M/yr
Severe hazardous variant release (acidic slime / casualties) or wide-scale establishment requiring large-scale reconstruction, compensation and international operations.
SCP-199-B_like_variant
mass_casualties
widespread_establishment
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 5 | [#10] 4 guards plus supervisory allocation for 24/7 coverage (rotation and clearance premium). |
| Research Scientist | 3 | [#11, #8] Botanists/plant physiologists and RF analysts conducting experiments and analysis. |
| Engineer / Maintenance | 2 | [#12] Electrical/HVAC/mesh and equipment technicians for regular and emergency repairs. |
| Administrative Staff | 1 | [#30] Program administration, procurement and liaison coordination (fractional/site allocation). |
Confidence Notes
Estimates are order-of-magnitude based on analyst ranges and the article; many items (field teams, legal payouts, variant behaviors) are variable so totals have moderate uncertainty.