SCP-2018
Euclid
?
low confidence
SCP-2018
Expected annual
$1.8M
One-time setup
$2.3M
Annual recurring
$1.7M
Personnel
15
One-time capital/setup costs are estimated at approximately $2,257,000, driven by property acquisition, structural buildouts (airlock/decon, containment) and contingency reserves; steady-state recurring costs are estimated at $1,720,000/year, driven primarily by staff wages (security and research), monthly mission operations, contracted rapid-response/transport retainer, and ongoing research/consumables.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal uneventful year with monthly missions and routine operations; no major incidents or large engineering interventions.
monthly D-Class missions
routine maintenance and research
no breaches or major incidents
🚨
Minor Incident
$2.0M/yr
Limited containment breach or hostile manifestation requiring short-term surge response (extra security overtime, medical treatment, contractor callouts, temporary repairs, and evidentiary review).
small breach / hostile specimen incident
injuries requiring medical evacuation
short-term additional contractor response
🚨
Structural Collapse Engineering
$2.7M/yr
Sustained decay of SCP-2018-1 or a decision to perform major engineering reinforcement/stabilization of the alternate-museum structure, requiring large one-time expenditures and heavy contractor involvement.
SCP-2018-1 structural degradation
decision to attempt physical reinforcement/archaeological stabilization
major reconstruction after partial collapse
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#2] 24/7 perimeter coverage (6 full-time equivalents to provide continuous two-person coverage). Salary assumptions per analyst notes. |
| Level-3 Researcher | 1 | [#10] Level-3 approval signatory required for SCP-2018 approvals; salary included in research staff budget. |
| Research Scientist | 2 | [#10] Mid-level research staff to analyze returned artifacts and run experiments; salary included in research staff budget. |
| Technician | 2 | [#10] Lab and field technicians to support missions and specimen handling; salary included in research staff budget. |
| Medical Officer | 1 | [#9] Dedicated medic for pre/post mission screening and emergency care; staffing cost included in payroll. |
| Containment Caretaker | 2 | [#12] Care and monitoring staff for living manifestations; staffing portion included in payroll estimate. |
| Psychologist / Mental Health Specialist | 1 | [#16] Psych ops and subject selection staff to manage memory/emotional selection protocols; salary included in payroll. |
Confidence Notes
Significant uncertainties remain: number/complexity of living manifestations, bio/psi hazard potential, whether Foundation uses purchase vs. lease, and whether large engineering interventions will be required. Many analyst estimates are ranges or speculative, so cost fidelity is low.