SCP-2047
Keter
~
medium confidence
SCP-2047
Expected annual
$17.7M
One-time setup
$1.3M
Annual recurring
$17.6M
Personnel
33
One-time capital/setup is approximately $1.26M for shielded containment, secondary vault, monitoring hardware, robotics and IT; recurring annual costs are approximately $17.55M driven primarily by 24/7 personnel, MTF operations, global monitoring, amnestic programs, and large contingency reserves.
One-Time Capital Costs
Total: $1.3M
Annual Recurring Costs
Total: $17.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$17.6M/yr
Normal year with routine operations, monitoring, and reserve funding; no major breaches or large-scale events.
routine_monitoring
no_breaches
steady_research_activity
🚨
Minor Incident
$18.1M/yr
Localized containment incident or public sighting requiring increased response, limited amnestic administrations and equipment repairs.
localized_public_detection
minor_containment_breach
targeted_remediation
🚨
Major Breach
$26.6M/yr
Significant containment failure with widespread detections, mass amnestic campaign, major remediation and infrastructure repair.
large_scale_breach
mass_public_exposure
extended_remediation
🚨
Event 2047 A
$67.5M/yr
Catastrophic Event 2047-A (large-scale spacetime exchange/structure event) requiring national/international emergency response, mass evacuations, and massive remediation/amnestics.
Event_2047-A_activation
systemic_spacetime_anomaly
mass_detections_and_remediation
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Guard | 12 | [#8] 24/7 guarded presence, three shifts; salary+benefits included in staff wages. |
| Containment Technician | 4 | [#8] On-site containment techs for experiments, maintenance and rapid response. |
| Research Scientist | 5 | [#9] Materials scientist, physicist, xenolinguist, xenobiologist/analyst, systems engineer (4–6 specialists; budgeted as 5). |
| MTF Agent / Operative | 12 | [#10] Dedicated Mobile Task Force personnel for global monitoring and field response. |
Confidence Notes
Line-item estimates are based on analyst budget ranges and canonical staffing models; construction and equipment costs are relatively well-defined, but probabilities for breaches and catastrophic events are highly uncertain and contingency/reserve sizing dominates variance.