SCP-2092
Safe
~
medium confidence
SCP-2092
Expected annual
$303.2M
One-time setup
$865.5M
Annual recurring
$180.0M
Personnel
50
Initial capital outlay is approximately $865,550,000 one-time driven by spacecraft builds, launches, mission integration, and contingency reserves; recurring costs are approximately $173,925,000/yr driven primarily by amortized replacement probes, ongoing covert suppression/influence, mission operations, and legal/PR operations.
One-Time Capital Costs
Total: $865.5M
Annual Recurring Costs
Total: $180.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$180.0M/yr
Normal uneventful year with scheduled operations and amortized replacements; no major failures or exposures.
normal operations
scheduled replacements (amortized)
no major incidents
🚨
Minor Incident
$653.9M/yr
Unexpected probe failure or loss of contact requiring immediate replacement and expedited launch with premium costs.
probe hardware failure
loss of contact with Probe-2092-A or B
expedited replacement launch required
🚨
Major Breach
$273.9M/yr
Significant political or public exposure requiring large-scale legal/PR operations, covert remediation, and episodic countermeasures.
public disclosure
partner-agency exposure
need for episodic electronic countermeasures
Personnel
50 total
| Role | Count | Notes |
|---|---|---|
| Mission Operations / Flight Control | 12 | [#6] Engineers/operators for 24/7 monitoring, trajectory corrections, and anomaly response; shift coverage included. |
| Research Scientist / Signal Analysis | 6 | [#14] Specialists to decode and interpret SCP-2092-1 data and advise on mission requirements. |
| Security Officer / Site Guards | 8 | [#8, #22] On-site guards, internal security teams, and armed response for Site-15 monitoring and access control. |
| Covert Operative / Embedded Agent | 20 | [#15] Undercover placements embedded in major space agencies to influence receiver designs and expunge records. |
| Engineer / Maintenance | 4 | [#6] Technical maintenance staff for ground-segment, comm, and SCIF hardware support. |
Confidence Notes
Analyst notes provide detailed, order-of-magnitude ranges for spacecraft and operational costs so central estimates are plausible, but spaceflight and covert-influence costs vary widely with architecture and geopolitical risk; this yields moderate confidence.