SCP-2094
Euclid
~
medium confidence
SCP-2094
Expected annual
$2.1M
One-time setup
$1.1M
Annual recurring
$2.1M
Personnel
13
One-time capital setup is approximately $1.09M driven by containment retrofit, imaging/robotics, and hazardous‑item handling fitouts. Annual operating costs are approximately $2.06M driven primarily by staff wages (security, medical, research), contingency/reserve funds, and legal/cover operations.
One-Time Capital Costs
Total: $1.1M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal year with standard operations, scheduled research, and routine maintenance without major incidents.
standard scheduled research
routine maintenance
no hazardous incidents
🚨
Minor Incident
$2.3M/yr
Non-catastrophic hazardous retrieval or contamination event requiring elevated medical care, contractor disposal, overtime, and incident investigation.
contaminated item recovered
local medical/cleanup required
short-term lockdown and specialist contractors
🚨
Major Breach
$3.3M/yr
Significant containment breach or discovery of active anomalous entities/items requiring cross-site response, MTF deployment, major upgrades, and prolonged legal/PR actions.
containment breach
active anomalous entity/item emergence
multi-site lockdown and specialist procurement
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] Six full-time guards (2 per shift × 3 shifts) assigned exclusively to SCP-2094 to satisfy two-person rules and continuous coverage. |
| Research Scientist | 3 | [#5] Small interdisciplinary research team (midpoint of 2–4) studying extradimensional storage, retrieval protocols, and item analysis. |
| Medical Officer | 2 | [#4] Psychiatrist/psychologist and a medical technician/nurse responsible for psychotropic maintenance, monitoring, and emergency care. |
| Engineer / Maintenance | 1 | [#7, #13] On-site engineer/technician for robotics, imaging systems, incinerator/autoclave, emergency lockdown systems, and routine maintenance. |
| Administrative Staff | 1 | [#17] Administrative/legal liaison to manage cover story assets, procurement, and GoI interaction coordination. |
Confidence Notes
Analyst notes provide detailed line items and ranges enabling mid-range estimates, but the "unlimited internal volume" property and potential for highly variable hazardous finds create significant upside cost uncertainty; contingency and contingency fund reflect this.