SCP-2128
Safe
~
medium confidence
SCP-2128
Expected annual
$8.5M
One-time setup
$29.5M
Annual recurring
$8.3M
Personnel
29
First-year capital costs are dominated by Site-403 construction, containment conversion and equipment (~$29.5M one-time). Recurring annual operations are primarily D-class procurement, staff wages and contingency reserves (~$8.34M/yr).
One-Time Capital Costs
Total: $29.5M
Annual Recurring Costs
Total: $8.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.3M/yr
Normal operations year with no major incidents; regular EP 37 usage at planned throughput and standard maintenance.
steady-state EP 37 use at 3/day
no major breaches
routine maintenance and audits
🚨
Minor Incident
$9.1M/yr
Localized containment incident or equipment failure requiring targeted cleanup, limited MTF activation and temporary increased autopsy/forensics workload.
small containment breach
localized contamination
equipment/structural damage during an experiment
🚨
Major Breach
$13.3M/yr
Significant containment failure or cascading incidents leading to cross-site mobilization, extended MTF operations, large-scale remediation and expensive cover operations.
large structural failure
widespread contamination
multi-site emergency response
🚨
Political Exposure
$10.8M/yr
Civilian awareness or media exposure of site activities requiring intensive cover operations, settlements, and possible temporary shutdown/decommissioning actions.
public discovery
leaked incident footage
local government scrutiny
Personnel
29 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#9] 12 full-time on-site guards as specified. |
| Site Director / Executive Staff | 1 | [#10] One site director (salary budgeted at ~$150k/yr). |
| Research Scientist | 6 | [#10] Six researchers to run experiments and analyze results. |
| Technician | 4 | [#10] Four technicians to operate equipment and maintain monitoring systems. |
| Medical Officer | 3 | [#10] Three medical staff for triage, autopsy coordination and biohazard handling. |
| Linguistics / Analysts | 3 | [#18] Linguistics and intelligence analysts to parse output and verify facts (budgeted separately). |
Confidence Notes
Analyst notes provide detailed line-item estimates and recommended budgets; major uncertainties remain around actual D-class consumption rates, anomalous byproduct remediation (potentially order-of-magnitude costs), and how often adverse scenarios occur, so confidence is medium.