SCP-2141 Euclid ~ medium confidence
SCP-2141
Expected annual
$5.8M
One-time setup
$12.5M
Annual recurring
$5.6M
Personnel
25
Initial capital/setup costs are estimated at approximately $12.51M driven primarily by construction/land control, contingency/mobilization reserves, and equipment purchases; ongoing annual operations are estimated at roughly $5.21M/year driven by staff wages, research/monitoring, and logistics/contracted services.
🏗️ One-Time Capital Costs Total: $12.5M
Major Event Mobilization Fund $5.0M
[#30] One-time establishment of a major-event mobilization fund for nationwide asset mobilization, large-scale remediation, or prolonged engineering response.
Contingency Reserve Establishment $3.0M
[#21] Establishment of an initial contingency / insurance reserve fund to cover catastrophic landscape damage, liabilities, and large repairs.
Facilities $2.5M
[#2, #3] Land acquisition/lease and site construction/retrofit (barracks, armory, decon bays, hardened comms, helipad/lander prep). Includes legal/closing costs within the facility estimate.
Equipment $1.3M
[#4, #8, #9, #12, #13, #15, #19, #23, #25, #26] Generator purchase, weapons & secure storage, decon-bay install, optical/film and shielded electronics, communications hardware, initial contamination-resistant armor, cold-storage vault, initial vehicle fleet acquisition, specialized deployables/containment materials, and shielding installation/testing rigs.
Initial Research And Lab Setup $600K
[#11] Secure wet-lab / specialized lab setup, initial instrumentation for bio/chem/EM analysis, sample handling, and containment-capable lab infrastructure.
Training Initial $100K
[#14] Initial intensive scenario training for personnel (rubber-weapon tactics, decon, landscape-damage response, legal/cover training).
Heavy Equipment Purchase $0
[#6] Purchase option for bulldozers/excavators/tracked dump trucks not included in baseline (baseline assumes on-call contracting rather than purchase).
Helicopter Purchase $0
[#7] Helicopter purchase option excluded from baseline (baseline assumes contracted airlift).
🔄 Annual Recurring Costs Total: $5.6M/yr
Staff Wages $2.8M/yr
[#1, #10] Continuous on-site personnel payroll (MTF rotation + site staff including medics). Estimate covers 24/7 staffing and on-call rotations.
Research And Monitoring $600K/yr
[#11, #22, #26] Ongoing biological/geomorphology/EM research staffing and contracts, periodic specialized contracted studies (geotechnical/EM specialists, forensic labs), and replacement/repairs related to monitoring and shielding.
Facilities Maintenance $400K/yr
[#3, #4, #5, #13, #23, #25] Routine site maintenance including generator servicing/fuel infrastructure support, road repairs/upkeep, gate/fence/camera maintenance, comms hardware service, vehicle fleet maintenance, and upkeep of removable containment deployables.
Logistics And Transport $400K/yr
[#6, #7, #23, #19] Contracted heavy-equipment on-call fees, contracted helicopter/airlift hours, vehicle fuel/field transport, and sample/evidence transport.
Heavy Equipment Contract $350K/yr
[#6] On-call contracting for bulldozers/excavators/dump trucks for landscape repairs (baseline uses contract rather than purchase).
Supplies And Consumables $160K/yr
[#8, #9, #12, #15, #19, #25] Ammunition (rubber rounds), PPE/HazMat consumables and laundering, film processing/consumables, armor replacements/repairs, evidence-chain consumables, and small upkeep supplies.
Cover Story And Legal $150K/yr
[#17] Legal counsel, FOIA/PR management, liaison officers, cover-story maintenance and local reimbursements/settlements when required.
Research Discretionary Fund $150K/yr
[#28] Contingent discretionary seed funding for accelerated containment-reducing or safety-improving research.
Medical And Evac $125K/yr
[#10] On-site medic salary portion included in staffing plus med-supply replenishment and medevac/evacuation contracts and infection-control surveillance costs.
Environmental Remediation $100K/yr
[#16] Routine remediation, erosion control, reforestation/repairs, and regulatory coordination for minor landscape impacts.
Hazardous Waste Disposal $80K/yr
[#9, #20] Disposal of contaminated PPE, soils, biohazardous wastes, and regulated hazardous-material handling.
Witness Control $75K/yr
[#18] Voluntary relocation assistance, temporary housing, counseling, and witness-support services.
Administrative Overhead $50K/yr
[#24] Paperwork, clerical staff, recordkeeping, and secure offsite record redundancy.
Training And Drills $40K/yr
[#14] Ongoing readiness drills, repetition of weapon/decon/landscape-response scenarios, and legal/cover rehearsals.
Annual Audit $40K/yr
[#29] Annual compliance audits, safety inspections, and mandated safety upgrade studies.
Psychological Support $30K/yr
[#27] Counseling, burnout mitigation, and rotation support programs for on-site personnel.
Evidence Storage And Archiving $10K/yr
[#19] Cold-storage maintenance, archival consumables, and physical film/video archiving costs.
Contingency Replenishment $0/yr
[#21, #30] Baseline assumes contingency reserves established up-front; no steady replenishment budget in baseline year unless expended (0 in baseline).
Cost Scenarios
📊 Baseline (baseline) $5.6M/yr
78.0% probability / year
Normal operational year with scheduled research, routine drills, and no major containment-breach-scale events; contracting used for heavy lift and air support.
routine_emergences_handled no_major_landscape_damage standard_research_schedule
🚨 Minor Incident $6.0M/yr
15.0% probability / year +$450K vs baseline
Single moderate retrieval results in localized infrastructure damage (road gouge, repairable erosion) and increased contractor usage for repairs and hazardous-waste handling.
single_major_retrieval localized_road_gouge moderate_hazardous_waste
🚨 Major Landscape Damage $8.2M/yr
5.0% probability / year +$2.6M vs baseline
Large-scale high-speed retrieval causes multi-km infrastructure damage (interstate-level), mass remediation, civilian compensation, and extended contractor mobilization.
interstate_damage widespread_infrastructure_failure major_environmental_remediation
🚨 Research Breakthrough Requiring Scale Up $6.2M/yr
2.0% probability / year +$650K vs baseline
Promising research indicates a path to safer/cheaper containment requiring rapid scale-up of testing, pilot systems, and contracted development.
promising_research_results need_for_pilot_scale-up
👥 Personnel 25 total
Role Count Notes
Security Officer / MTF Agent 12 Front-line MTF troopers and patrols covering 24/7 rotations.
Research Scientist 4 Biology/geomorphology/EM specialists contracted or on staff for ongoing monitoring.
Site Director / Executive Staff 1 Site Administrator / command.
Medical Officer 1 On-site medic/EMT coverage.
Engineer / Maintenance 3 Facility systems, generators, vehicle and small-equipment maintenance.
Administrative Staff 2 Clerical, recordkeeping, FOIA and logistics coordination.
Logistics / Vehicle Operators 2 Drivers, contracted-liaison, and equipment operators for field tasks.
📋 Confidence Notes
Analyst notes provide detailed ranges for most line items enabling reasonable mid-point estimates, but uncertainty remains due to variable incident frequency/severity, optional purchase vs. contract choices (helicopters/heavy equipment), and contingent legal/environmental liabilities.
← SCP-2140 ↑ All SCPs SCP-2142 →