SCP-2146
Euclid
~
medium confidence
SCP-2146
Expected annual
$3.0M
One-time setup
$253.9M
Annual recurring
$2.6M
Personnel
15
One-time capital/setup costs are dominated by establishing a resilient radio monitoring network, IT/hardened storage, and contingency planning (~$254M including a low-probability retrieval mission). Recurring annual costs are driven by staff wages, covert infiltration/cover operations, legal/PR, and monitoring subscriptions (~$2.64M/year).
One-Time Capital Costs
Total: $253.9M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal uneventful year: steady monitoring, covert operations, legal/cover maintenance and routine research.
monthly broadcasts monitored
no public exposure
no orbital emergency
🚨
Minor Incident
$2.8M/yr
Localized exposure or a handful of civilian detections requiring extra travel, amnestics, and targeted PR/legal work.
small leak or viral hobbyist post
several in-person responses required
🚨
Major Breach
$4.6M/yr
Significant public exposure or regulatory investigation requiring mass response, enhanced legal defense, and large PR campaign.
widely publicized leak
regulatory/legal action
coordinated amateur salvage attempts
🚨
Catastrophic Reentry
$12.6M/yr
Uncontrolled orbital decay/re-entry requiring large-scale hazmat response, public safety operations, and cleanup.
orbital decay / re-entry predicted
impact footprint on populated area
🚨
Retrieval Mission
$252.6M/yr
Authorization and execution of an orbital retrieval/close rendezvous mission to recover SCP-2146.
policy decision to recover object
transmissions turn dangerous or recovery becomes feasible
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#9] MTF-Mu-19 covert operatives embedded in astronomical societies (operatives on payroll/benefits) |
| Research Scientist | 3 | [#3] Radio/space analysts handling archive, transcription, and signal analysis |
| Technician / Field Technician | 3 | [#2] Radio network technicians for calibration, repairs, and station maintenance |
| Site Director / Program Manager | 2 | [#21] Program manager and compliance officer overseeing operations and audits |
| Administrative Staff | 1 | [#14] Public complaints monitoring / administrative support (0.5–1 FTE rounded to 1) |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a reasoned mid-point budgeting approach; large uncertainties remain for low-probability events (retrieval, re-entry) and vendor/pricing variability, so confidence is medium.