SCP-216
Safe
~
medium confidence
SCP-216
Expected annual
$1.7M
One-time setup
$7.4M
Annual recurring
$1.5M
Personnel
11
One-time capital expenses of approximately $7.37M driven primarily by optional exhaustive mapping and a potential BSL-3 construction; recurring annual costs are about $1.53M/yr driven mainly by staff wages, testing/forensics, and institutional overhead.
One-Time Capital Costs
Total: $7.4M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal operational year with no major incidents; routine testing, scheduled maintenance, and steady staffing.
routine containment
scheduled testing
no incidents
🚨
Minor Incident
$1.6M/yr
Small containment or retrieval incident requiring activation of emergency response, limited hazardous disposal, overtime and repairs.
injury during retrieval
contaminated sample requiring disposal
limited mechanical failure
🚨
Major Breach
$3.0M/yr
Significant containment breach or incident leading to extended remediation, large-scale hazmat response, legal/cover operations and site impacts.
violent animal or dangerous biological release
large-scale contamination
multi-team remediation
🚨
Research Scale Up
$7.0M/yr
Decision-year to pursue an exhaustive mapping campaign or major expansion (purchase of full-exhaustive mapping CAPEX and scale-up staffing).
management authorizes exhaustive mapping
large capital investment approved
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | [#3] Dedicated scientific staff (2–4 FTEs suggested); estimate uses 3 FTEs to support experiments, retrievals, and analysis. |
| Security Officer / MTF Agent | 3 | [#2] On-site guards for 24/7 coverage and access control; estimate assumes 3 guards for continuous rotation. |
| Containment Technician | 3 | [#4] Trained technicians for handling, logging, chain-of-custody and inventories; estimate uses 3 techs. |
| Engineer / Maintenance | 1 | [#6, #19] On-call engineer/maintenance to support robotics, sensors, and lockwork maintenance. |
| Administrative Staff | 1 | [#25] Small administrative support for HR, procurement, and program accounting. |
Confidence Notes
Analyst notes provide detailed line items and ranges for nearly every cost driver, allowing a moderate-confidence estimate. Large optional items (exhaustive mapping, BSL-3 construction, wide field ops) have wide ranges and drive most uncertainty, reducing confidence from 'high' to 'medium'.