SCP-2191
Keter
~
medium confidence
SCP-2191
Expected annual
$6.8M
One-time setup
$234.2M
Annual recurring
$6.2M
Personnel
34
One-time capital expenditures are dominated by optional large-scale contingency and the potential construction of a local BSL-4 (total one-time ~234M). Recurring annual baseline operations (personnel, remote sensing, drones, legal/cover operations, research) are ~6.2M/yr; major breaches could drive multi-million to multi‑million+ responses.
One-Time Capital Costs
Total: $234.2M
Annual Recurring Costs
Total: $6.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.2M/yr
Normal year: steady-state remote surveillance, routine research, cover maintenance, and no major incidents or infrastructure-scale interventions.
no_major_incident
routine_operations
🚨
Minor Incident
$7.0M/yr
Localized breach or civilian discovery requiring emergency response, limited public mitigation, surge staffing, mortuary handling, and increased legal/cover actions.
small_public_breach
localized_mass_casualty
evidence_discovery
🚨
Major Breach
$56.2M/yr
Large public exposure or mass-casualty event requiring wide-area cordons, major containment infrastructure, large contingency spending, potential construction or major scale-up of facilities (including possible local BSL-4 build), and intensive legal/cover operations.
widespread_public_exposure
mass_casualty_event
political_exposure
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Field Operative / Ranger | 18 | [#4] 24/7 field coverage in three shifts; patrol, drone ops, medics, logistics. |
| Security Officer / MTF Agent | 10 | [#5] Armed response unit (8–12 specialists), authorized for lethal force during breaches; includes training. |
| Research Scientist | 6 | [#6] Specialist scientific staff (biologists, parasitologists, archaeologists) with partial off-site duties and periodic deployments. |
Confidence Notes
Estimates are based on analyst item ranges and midpoints; many line items (e.g., BSL-4 build, large contingency interventions) are optional and carry high uncertainty. Operational recurring costs are better defined, but contingency/scale-up scenarios introduce low confidence in upper-tail one-time estimates.