SCP-2217
Thaumiel
~
medium confidence
SCP-2217
Expected annual
$6.3M
One-time setup
$9.3M
Annual recurring
$6.0M
Personnel
27
Estimated one-time capital costs are approximately $9.3M driven primarily by land purchase, facility buildouts, lab capital equipment and major equipment purchases; ongoing annual operations are approximately $6.05M/yr driven chiefly by personnel, long-term research, and recurring logistics/monitoring.
One-Time Capital Costs
Total: $9.3M
Annual Recurring Costs
Total: $6.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.0M/yr
Normal operational year with no major incidents; routine research, monitoring, and containment activities.
routine operations
scheduled research and maintenance
🚨
Minor Incident
$6.8M/yr
Localized containment incident or increased anomalous production requiring limited emergency response, repairs, and PR/legal action.
small breach/trespassing event
localized equipment damage
heightened anomalous artifact formation
🚨
Major Breach
$14.1M/yr
Large-scale attack or containment failure (e.g., GOI assault, large anomalous outbreak) requiring full mobilization, asset replacement, and large-scale recovery operations.
sustained GOI assault
large anomalous event requiring evacuation and reconstruction
loss of key assets (boats, robotics, lab infrastructure)
Personnel
27 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#10] Ten security personnel noted in analyst staffing example; higher pay for remote/secret posting included in staff wages. |
| Research Scientist | 6 | [#10] Six scientists included in core staff; involved in analysis and long-term research program. |
| Technician / Lab Tech | 6 | [#10] Six technical staff for lab operations, robotics support, and instrumentation maintenance. |
| Medical Officer | 2 | [#10] Two medics on-site; medical clinic and supplies listed separately. |
| Engineer / Maintenance / Logistics | 3 | [#10] Three logistics/operations staff covering boats, power, facilities maintenance and transport coordination. |
Confidence Notes
Estimates are based on detailed analyst line items but include multiple 'OR' options (purchase vs. lease, purchase vs. charter) and midpoints for ranges; remote/island logistics and Thaumiel operational variability introduce moderate uncertainty.