SCP-224
Euclid
~
medium confidence
SCP-224
Expected annual
$4.2M
One-time setup
$5.9M
Annual recurring
$3.7M
Personnel
37
Initial capital outlay is substantial (several million) driven by a secure, soundproof vault, custom acoustic cancellation hardware, robotics and research instrumentation; recurring annual costs are dominated by security, research/staffing, and weekly consumable replacement nodes.
One-Time Capital Costs
Total: $5.9M
Annual Recurring Costs
Total: $3.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.7M/yr
Uneventful year with standard operations, weekly node replacement, routine maintenance, and no significant chime incidents.
no_chime_events
routine_maintenance
normal_staffing
🚨
Minor Incident
$3.8M/yr
Small localized chime event with no human exposures and limited equipment checks/cleanup.
small_chime_radius
equipment_checks
minor_cleanup
🚨
Major Incident
$4.2M/yr
Moderate chime event causing equipment damage and several exposed personnel requiring medical treatment and extended research/legal responses.
moderate_chime_radius
personnel_exposure
equipment_replacement
🚨
Catastrophic Breach
$203.7M/yr
Large-radius chime with public exposure resulting in mass medical response, litigation, large-scale cleanup and potential relocation/major contingency spending.
large_public_exposure
mass_casualties
major_legal_liability
Personnel
37 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 15 | [#8] 12 on-site guards (3 shifts) plus 2–4 specialist agents for rapid response; aggregated count. |
| Research Scientist | 4 | [#14] Core research staff funded by ongoing research program budget. |
| Remote Operator / Technician | 4 | [#7] Operators to monitor feeds, run weekly node replacements, and maintain DSP/robotics; 3–5 FTE covered by staff_wages. |
| Engineer / Maintenance | 2 | [#4,#16] Maintain robotics, DSP racks, HVAC and lifecycle replacements; supported by maintenance budgets. |
| Medical Officer / Nursing | 2 | [#10] Medical readiness and acute care capacity for exposed personnel. |
| Administrative Staff | 2 | [#24] Procurement, accounting and site administrative support. |
| Site Director / Executive Staff | 1 | [#24] Overall site leadership and liaison responsibilities. |
| Class-D Personnel | 6 | [#11] Rotation of Class-D for permitted entry tasks; example rotation ~6 D. |
| Data/IT Security Operator | 1 | [#18] Manages encrypted archival, secure logs and restricted access systems. |
Confidence Notes
Analyst notes provide detailed line items and plausible midpoints but ranges are wide for key drivers (node consumables, research scale, and catastrophic exposure). Costing uses mid-range estimates and scenario modeling to capture variability.