SCP-2253
Safe
~
medium confidence
SCP-2253
Expected annual
$912K
One-time setup
$1.9M
Annual recurring
$904K
Personnel
10
Estimated first-year one-time setup is approximately $1.86M, driven primarily by property acquisition, buildout for a public brewery and an underground lab, and instrumentation. Recurring annual costs are approximately $903,500, driven mainly by staff wages (brewers, researchers, and security), utilities/maintenance, and analytical/research operations.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $904K/yr
Cost Scenarios
📊
Baseline
(baseline)
$904K/yr
Normal operational year with no major incidents; routine sampling, research, and cover operations proceed as planned.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$928K/yr
Small-scale medical or contamination event requiring localized medical response, cleanup, and PR/legal handling.
local_medical_reaction
small_batch_contamination
minor_property_damage
🚨
Major Breach
$1.3M/yr
Hostile attempt to seize or damage the site (histor precedent of attempted seizure), or a larger-scale public incident requiring repairs, legal action, and amnestics.
hostile_attempted_seizure
large_scale_property_damage
widespread_public_incident
🚨
Research Scaleup
$1.1M/yr
Research breakthrough or new experimental program requiring rapid instrumentation purchases, hire of additional staff, or expanded lab capacity.
research_breakthrough
need_for_additional_instrumentation
scale_up_experiments
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Brewer / Taproom Staff | 5 | [#11] Two brewers (covered as cleared Level-2), one manager, and 2 bartenders to maintain the public-facing brewery and plausibility of operations. |
| Research Scientist | 2 | [#12] Two researchers/technicians to run the underground lab, analyses, and sample handling. |
| Security Officer / MTF Agent | 3 | [#13] Three on-site guards to provide shift coverage for the taproom perimeter and lab access control. |
Confidence Notes
Estimates are based on analyst ranges and standard Foundation cover operations; many line items have wide ranges (real estate, construction, instrumentation), and site-specific factors (purchase vs lease, production scale) materially affect totals.