SCP-229
Euclid
~
medium confidence
SCP-229
Expected annual
$2.6M
One-time setup
$3.0M
Annual recurring
$2.5M
Personnel
28
Estimated one-time startup costs are roughly $3.0M driven by land/site preparation, granite containment construction, and specialized non-electric equipment; recurring annual costs are ~ $2.54M driven by staffed 24/7 security, ongoing research/monitoring, ash disposal, and legal/cover operations.
One-Time Capital Costs
Total: $3.0M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Normal year with no major incidents; ongoing operations, scheduled training, routine ash disposal, and research continue.
routine_operations
no_incidents
🚨
Minor Incident
$2.8M/yr
Localized containment event requiring emergency response, extra incineration/disposal, short-term overtime, and limited remediation.
localized_infestation
equipment_failure
🚨
Major Breach
$7.5M/yr
Significant spread or urban infestation requiring mass-sterilization response, large-scale remediation, major legal/cover payouts, and extensive medical/relief operations.
urban_outbreak
breach_during_transfer
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#12] 24/7 manned security force to replace electronic monitoring (three shifts, rotation). |
| Research Scientist | 4 | [#18] Scientists and technical staff performing non-electric experiments and monitoring. |
| On-site Response / Containment Technician | 6 | [#13, #14] Trained containment operators who handle transfers, incineration operations, and suit handling. |
| Medical Officer | 1 | [#15, #19] Provides medical surveillance, blood testing, and quarantine oversight. |
| Engineer / Maintenance | 2 | [#3, #5, #6] Maintains mechanical airlocks, ventilation, and site infrastructure without electrical systems within the exclusion zone. |
| Administrative Staff | 2 | [#23] Documentation, records management, and administrative support for paper/off-site digitization systems. |
| Site Director / Executive Staff | 1 | [#1, #22] Senior oversight, liaison, and legal/cover coordination. |
Confidence Notes
Costs are built from analyst estimates and SCP containment constraints; many line items have wide location-dependent ranges (land costs, utility rerouting, and large-scale remediation). The operational constraints (no electricity within 30 m) are well-defined, but cost variability is high—hence medium confidence.