SCP-2328 Euclid ~ medium confidence
SCP-2328
Expected annual
$3.2M
One-time setup
$6.3M
Annual recurring
$3.1M
Personnel
19
Initial capital/setup costs are approximately $6,290,000 one-time, driven by containment construction, contingency reserves and specialized equipment. Recurring annual costs are about $3,148,000/yr, driven primarily by staff wages, secure disposal/logistics and facility maintenance/energy.
🏗️ One-Time Capital Costs Total: $6.3M
Facilities $3.3M
[#2, #13, #16, #22] Containment facility construction/upgrade (mid-range $3,000,000) plus decontamination bay install (~$137,500), backup generator/install (~$70,000) and personnel housing fit-out (~$100,000).
Equipment $840K
[#3, #6, #7, #9, #14, #17, #20] On-site secondary containment roll-off containers and racks (~$100k), PPE/decon system (~$150k), packaging machinery (~$40k), vehicle purchase/retrofit (~$225k), environmental sensor suite (~$75k), archive shelving & DB hardware (~$75k), security infrastructure hardware (~$175k).
Scale Up Contingency Reserve $750K
[#25] Contingency reserve for sudden scale-up or hazardous-content events (~$750,000 recommended).
Insurance And Liability Reserve $600K
[#19] Recommended insurance/liability/reserve fund (~$600,000 one-time reserve).
On Site Processing Setup $250K
[#10] Small localized pre-processing / workshop / neutralization setup (~$250,000 one-time).
Initial Research And Lab Setup $225K
[#11] Initial laboratory setup and study-specific equipment for microbiology/chemical/radiological testing (~$225,000).
Emergency Response Cache $200K
[#24] Rapid-response kit, neutralization equipment and training (~$200,000 one-time).
Legal Cover Setup $62K
[#18] Initial setup of cover story/legal groundwork (~$62,500 one-time).
Training And Sop Development $35K
[#21] Initial SOP and curriculum development (~$35,000 one-time).
Initial Medical Screening $20K
[#12] Initial baseline employee medical screening (~$20,000 one-time).
🔄 Annual Recurring Costs Total: $3.1M/yr
Staff Wages $1.6M/yr
[#4, #5] Security staffing (15 guards incl. benefits ≈ $1,170,000/yr) and on-site technical/research staff (4 staff incl. benefits ≈ $468,000/yr).
Logistics And Transport $470K/yr
[#8, #9] Monthly bulk disposal/incineration and transport services (~$400,000/yr) plus vehicle fuel/maintenance & drivers (~$70,000/yr).
Facilities Maintenance $252K/yr
[#13, #14, #20, #7, #16, #15] Decon consumables & maintenance (~$25,000/yr), environmental sensor calibration/maintenance (~$27,500/yr), security infrastructure maintenance (~$25,000/yr), packaging/roll-off maintenance (~$10,000/yr), energy/fuel for backup & HVAC (~$75,000/yr), pest control/odour management (~$90,000/yr).
Research And Monitoring $238K/yr
[#11, #17] Ongoing laboratory sampling/testing/research staff (~$225,000/yr) plus archival storage/cataloguing (~$12,500/yr).
Medical Monitoring $110K/yr
[#12] Ongoing employee health screening, vaccinations, treatment reserve (~$60,000/yr) plus emergency treatment reserve (~$50,000/yr).
Cover Story And Legal $100K/yr
[#18] Ongoing legal/PR/permits retainer and cover-story maintenance (~$100,000/yr).
On Site Processing Operations $100K/yr
[#10] Operations and staffing for on-site waste pre-processing (~$50k–$150k/yr; mid-range $100,000/yr).
Housing And Allowances $100K/yr
[#22] Ongoing meal/allowances or housing support for remote on-site staff (~$50k–$150k/yr; mid-range $100,000/yr).
Supplies And Consumables $70K/yr
[#6, #23] PPE consumables and filter replacement (~$35,000/yr) and miscellaneous consumables/office costs (~$35,000/yr).
Emergency Response Readiness $50K/yr
[#24] Readiness, training and replenishment for rapid-response/neutralization (~$50,000/yr).
Training And Refresher $20K/yr
[#21] Annual refresher training and records (~$10k–$30k/yr; mid-range $20,000/yr).
Waste Generation Baseline $0/yr
[#1] Calculation/assumption item (12 m3/day ≈ 657 tonnes/yr) underpinning logistics and capacity planning; no direct dollar cost.
Cost Scenarios
📊 Baseline (baseline) $3.1M/yr
88.0% probability / year
Normal year with no major incidents; routine operations, monthly disposal, and regular maintenance.
steady_generation_rate routine_monthly_disposal no breaches or contamination spikes
🚨 Minor Incident $3.4M/yr
10.0% probability / year +$300K vs baseline
Localized incident (e.g., discovery of hazardous materials in refuse, limited contamination, small breach requiring response and extra disposal).
hazardous waste discovered limited contamination requiring emergency disposal medical exposures among small number of staff
🚨 Major Breach $5.6M/yr
2.0% probability / year +$2.5M vs baseline
Significant containment failure or rapid, sustained spike in generation/compositional hazard requiring large-scale disposal, site remediation, extended medical/legal response and temporary relocation.
rapid generation spike widespread contamination extended neutralization and legal exposure
👥 Personnel 19 total
Role Count Notes
Security Officer / MTF Agent 15 [#4] Four-person on-site team present 24/7; staffing pool of ~12–16 to cover rotations — analyst used 15 guards for budgeting.
Research Scientist / Containment Technician 4 [#5] Resident containment techs (2–3), one site supervisor, and one assigned researcher/behavioral specialist (total 4).
📋 Confidence Notes
Analyst notes provide detailed line items and reasonable mid-range selections, but many estimates are order-of-magnitude ranges (disposal rates by locality, choice of in-house vs contracted services, and anomalous behavior variability). Uncertainty in future compositional changes of refuse and local disposal pricing reduces confidence.
← SCP-2327 ↑ All SCPs SCP-2329 →