SCP-234 Euclid ~ medium confidence
SCP-234
Expected annual
$8.7M
One-time setup
$17.2M
Annual recurring
$8.4M
Personnel
22
Initial capital/setup costs are large (≈$17.2M) driven by land, open-air lab construction, incident contingency and legal reserves; recurring annual costs are dominated by staff, research, and operational safety (~$8.25M/yr).
🏗️ One-Time Capital Costs Total: $17.2M
Incident Contingency Reserve $5.2M
[#17] Initial incident/remediation reserve for catastrophic implosion remediation, engineering stabilization and environmental cleanup (recommended multi-million reserve funded initially).
Facilities $4.7M
[#1, #3, #15] Land acquisition/lease and consolidation, construction of the custom open-air laboratory, and access infrastructure (roads/helipad).
Legal And Settlement Reserve $2.6M
[#18] One-time legal/retainer/settlement reserve for initial mitigation, potential large payouts and legal defense (initial funding).
Decommissioning $1.1M
[#28] Long-term decommissioning and safe closure cost (one-time when required).
Initial Research And Lab Setup $775K
[#10, #12, #21] Development of specialized microchambers (design/prototyping), purchase of non-sealed instrumentation (acoustic arrays, high-speed imaging) and one-time sterile/open-format supply system setup.
Remote Destruction Systems $750K
[#7] Redundant remote demolition/fail-safe destruction systems (EOD robots, linear charges, remote launchers) one-time purchase and installation.
Off Grid Power $600K
[#14] Off-grid power systems (generators, solar arrays, UPS) installed to provide redundant power to sensors, robotics and demolition triggers.
Drones And Robotics $550K
[#9] Fleet purchase of aerial and ground drones/robotics for handling, monitoring and emergency response (initial procurement).
Equipment $300K
[#4] Perimeter security hardware, signage and intrusion detection hardware (one-time purchase/install).
Communications And Data $300K
[#13] Long-range communications link setup, encrypted storage and off-site backup infrastructure (initial setup).
Regulatory And Cover Setup $275K
[#2] Initial regulatory/airspace closure filings, PR/legal work to establish cover story and obtain permits (one-time setup/filing fees).
🔄 Annual Recurring Costs Total: $8.4M/yr
Staff Wages $2.5M/yr
[#5, #6] Ongoing salaries/benefits for security personnel (24/7 guards) and scientific staff including two Level-4 supervisors and technicians.
Research And Monitoring $1.8M/yr
[#12, #23] Core research budget and ongoing monitoring/instrument maintenance (acoustics, extradimensional studies, instrument calibration and staff research time).
Cover Story And Legal $855K/yr
[#2, #18, #19] Ongoing PR/legal upkeep, covert settlement & liaison costs, and cover-up logistics/false records maintenance.
Experiment Operations $800K/yr
[#24, #10, #11] Per-experiment operational costs (pre-checks, consumables, single-use chamber destruction) aggregated over expected experiment frequency.
Incident Contingency Funding $500K/yr
[#17] Annual reserve contribution to replenish contingency funds for remediation and unexpected major incidents.
Supplies And Consumables $335K/yr
[#11, #20, #21] Yearly consumables: single-use chamber inventory, sensor disposables, clothing/personal gear program, and recurring sterile/open-format supply consumables.
Facilities Maintenance $320K/yr
[#4, #14, #15] Ongoing maintenance and monitoring for perimeter infrastructure, power system upkeep (fuel/maintenance) and access infrastructure upkeep (roads/helipad).
Replacement After Implosions $300K/yr
[#26] Replacement and redundancy planning for equipment lost or destroyed in occasional implosion incidents.
Logistics And Transport $250K/yr
[#16, #15] Medevac standby contract and transport/helipad operational costs and other logistics/transport upkeep.
Data Analysis And Archival $175K/yr
[#25] Secure off-site data analysis, archival costs and third-party/red-team audits.
Drones And Robotics Maintenance $125K/yr
[#9] Maintenance, spare parts, and replacement cycles for aerial and ground robotics fleet.
Off Grid Power Maintenance $125K/yr
[#14] Fuel, generator maintenance, solar maintenance and UPS servicing.
Training And Drills $125K/yr
[#22] SOP development, frequent training, evacuation drills and audit documentation.
Remote Destruction Maintenance $90K/yr
[#8] Maintenance, replacement explosives/charges, robot upkeep and regular testing/calibration of demolition systems.
Psychological Support $60K/yr
[#27] Counseling, screening and resilience programs for staff.
Communications And Data $30K/yr
[#13] Bandwidth, satellite/fiber leases, encrypted storage maintenance and off-site backup costs.
Cost Scenarios
📊 Baseline (baseline) $8.4M/yr
89.5% probability / year
Normal operational year with routine research, maintenance, no major incidents.
routine operations no implosion incidents regular experiments
🚨 Minor Incident $8.7M/yr
8.0% probability / year +$345K vs baseline
Single small implosion or experiment accident causing localized damage, medevac and limited replacement needs.
sealed item inadvertently introduced (<1 severe casualty) single-room implosion with limited structural damage medical evacuations and equipment replacement
🚨 Major Breach $16.2M/yr
2.0% probability / year +$7.8M vs baseline
Significant implosion destroying major portion of lab infrastructure requiring large remediation and legal payouts.
large accidental sealed-volume chain reaction multiple injuries/loss of life major structural damage and high legal exposure
🚨 Catastrophic Breach $33.2M/yr
0.5% probability / year +$24.8M vs baseline
Program-level catastrophe: multi-implosion event or single catastrophic implosion causing near-total site loss, extended remediation and heavy litigation/settlements.
chain-reaction implosion destroying containment area extensive environmental remediation major litigation and program decommissioning
👥 Personnel 22 total
Role Count Notes
Security Officer / MTF Agent 8 24/7 site guards and enforcement team (midpoint of 6–12); salaries included in staff_wages.
Research Scientist 6 On-site lead scientists and senior researchers (part of scientific team; includes specialist roles).
Level-4 Personnel 2 Two Level-4 supervisors required for approvals; higher compensation reflected in staff_wages.
Technician / Engineer / Maintenance 2 Robotics, instrumentation, power and facility maintenance staff included in staffing costs.
Medical Officer / Paramedic 2 Medical readiness, trauma response coordination and medevac liaison; medevac contracts are recurring costs.
Administrative Staff 2 Site admin, logistics, cover-story coordination and recordkeeping; costs included in staff_wages and cover_story_and_legal.
📋 Confidence Notes
Analyst notes provide detailed line-item ranges allowing informed mid-point estimates, but many items (incident frequency, settlement sizes, experiment rates, regional land costs) are highly uncertain, producing moderate confidence.
← SCP-233 ↑ All SCPs SCP-235 →