SCP-2343
Keter
?
low confidence
SCP-2343
Expected annual
$182.4M
One-time setup
$2.9B
Annual recurring
$178.5M
Personnel
38
Initial one-time capital outlay is dominated by procurement of active and spare SRAs/NPDNs and associated specialized infrastructure, totaling several billion USD. Annual operating costs are driven by device preventive maintenance, continuous power, and specialized staffing, resulting in a large recurring budget on the order of hundreds of millions per year.
One-Time Capital Costs
Total: $2.9B
Annual Recurring Costs
Total: $178.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$178.5M/yr
Normal operational year with no major containment incidents; routine maintenance, staffing, and utilities only.
no major device failures
routine maintenance only
🚨
Minor Incident
$183.5M/yr
Localized failure or small breach requiring emergency response, limited device replacement or rapid reconfiguration, and investigation.
single SRA/NPDN failure
small-scale escape attempt
MERT activation
🚨
Major Breach
$278.5M/yr
Significant containment breach requiring replacement of multiple devices, extended emergency operations, inter-site coordination and major repair.
multiple device failures
prolonged power/failover event
large-scale recontainment operation
🚨
Catastrophic Breach
$1.7B/yr
Catastrophic containment failure with loss or destruction of many SRAs/NPDNs, invocation of contingency funds, major legal/PR costs and potential external damage control.
simultaneous multi-device failure
extended grid outage
large-scale reality restructuring
Personnel
38 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#9] Armed guards and containment response team — 24 on-site personnel (estimate within 18–30 range). |
| Engineer / Maintenance (SRA/NPDN specialists) | 8 | [#8] Specialized SRA/NPDN engineers and technicians — 6–12 staff; 8 assumed for staffing model. |
| MERT / Rapid Response Team | 6 | [#10] Mobile emergency response team members and drivers/operators for mobile rigs. |
Confidence Notes