Expected annual
$164.1M
One-time setup
$295.9M
Annual recurring
$154.6M
Personnel
16
Initial one-time build and stockpiling costs are large (hundreds of millions) driven by emergency stockpile and contingency reserve; recurring annual costs are dominated by per-dose production and field/monitoring operations (hundreds of millions per year if production remains small-batch).
One-Time Capital Costs
Total: $295.9M
Annual Recurring Costs
Total: $154.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$154.6M/yr
Uneventful year with routine operations, regular re-dosing cadence, monitoring and no major public exposures.
routine_re_dosing
no_public_exposure
🚨
Minor Incident
$159.6M/yr
Localized exposure or small cluster requiring additional field response, limited emergency dosing and extra takedown operations.
localized_exposure
small_cluster
rapid_administration
🚨
Major Breach
$354.6M/yr
Significant containment breach with dozens to hundreds exposed requiring mass administration, widespread amnestic use and stockpile drawdown.
facility_breach
widespread_exposure
stockpile_drawdown
🚨
Political Exposure
$204.6M/yr
High-profile public leak or media event forcing aggressive legal/PR operations, large amnestic campaigns and covert influence operations.
public_leak
media_coverage
political_pressure
🚨
Catastrophic Breach
$654.6M/yr
Nationwide or multi-site uncontrolled exposure requiring massive national-level campaigns, full contingency reserve deployment and international operations.
nationwide_exposure
mass_media_propagation
failure_of_containment
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Medical Officer / Nurse / Pharmacist | 8 | [#5, #4] Core medical staff responsible for intake dosing, IV administration and symptomatic care (6–12 FTE recommended; midpoint used). |
| Research Scientist | 2 | [#9, #8] On-site research staff supporting yield-improvement R&D and assay development (staffing funded largely in research budget). |
| Engineer / Maintenance | 2 | [#3, #28] Facilities and cold-chain engineering/maintenance required for freezers, HVAC, and GMP equipment. |
| Administrative Staff | 3 | [#12, #27] Administrative, HR and liaison functions supporting retirements, records and audit/ethical liaison. |
| Site Director / Executive Staff | 1 | [#27] Senior site leadership and decision-making (oversight of containment and external liaison). |
Confidence Notes