SCP-239
Keter
~
medium confidence
SCP-239
Expected annual
$3.0M
One-time setup
$4.7M
Annual recurring
$3.0M
Personnel
16
Initial capital and installation are approximately $4.73M driven by containment chamber construction, telekill headgear procurement, research equipment and a large contingency reserve. Ongoing annual operating costs are roughly $2.95M/year, driven primarily by 24/7 security staffing, medical/research personnel, controlled-substance handling, and administrative/OPSEC overhead.
One-Time Capital Costs
Total: $4.7M
Annual Recurring Costs
Total: $3.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.0M/yr
Uneventful year with normal operations and routine maintenance only.
normal_operations
no_incidents
🚨
Minor Incident
$3.1M/yr
Small containment incident or equipment failure requiring emergency response, temporary repairs and limited use of amnestics.
small_equipment_failure
limited_breach
targeted_amnestics
🚨
Major Breach
$4.5M/yr
Significant containment breach or prolonged system failure requiring large-scale emergency measures, repair and relocation efforts.
extended_power_loss
critical_system_failure
expanded_containment_response
🚨
Catastrophic Breach
$13.0M/yr
Catastrophic loss of containment with escalation requiring extreme countermeasures, off-site isolation or destruction of subject and wide-scale amnestic operations.
subject_awakening
full_containment_failure
public_exposure
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#6] Four guards per shift × three shifts = 12 FTE assumed for 24/7 coverage; salaries/hazard pay included in staff_wages. |
| Medical Officer / Nurse | 2 | [#9] Two FTE nurses/medics for daily IV refill and monitoring; included in staff_wages. |
| Research Psychologist | 1 | [#9] One psychologist to supervise conditioning scripts and monitor subject; included in staff_wages. |
| Research Scientist / Supervising Researcher | 1 | [#9] One supervising researcher for research coordination and oversight; included in staff_wages. |
Confidence Notes
Analyst notes provide line-item estimates for every category, allowing a coherent budget; however, many items (telekill gear, anomalous-radiation research, contingency spend and probabilities for breaches) are uncertain or depend on classified technical choices, so cost estimates retain moderate uncertainty.