SCP-2404
Euclid
~
medium confidence
SCP-2404
Expected annual
$1.8M
One-time setup
$2.9M
Annual recurring
$1.7M
Personnel
16
One-time setup and major-contingency construction drive costs (total one-time ~ $2.95M), while recurring annual costs are dominated by security and medical staffing plus ongoing research/monitoring (~ $1.70M/yr). Main drivers: security wages, on-call medical staffing, and research/monitoring programs; Site-35 construction is the largest potential one-time expense.
One-Time Capital Costs
Total: $2.9M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal year with no major incidents; routine operations, staffing, maintenance, and scheduled research.
no major equipment failures
no relocations
routine research activity
🚨
Minor Incident
$1.8M/yr
Localized flooding or equipment failure requiring remediation and temporary increased staffing.
pump failure
localized sump overflow
sensor or power failure leading to water intrusion
🚨
Major Breach
$3.9M/yr
Significant containment breach or decision to relocate/build Site 35 requiring major one-time capital outlay and emergency remediation.
uncontrolled large-volume water generation
sustained power loss during generation
decision to construct/activate Site 35
🚨
Research Scaleup
$2.2M/yr
Accelerated research program or countermeasure development requiring rapid scale-up and outside contracts.
promising countermeasure breakthrough
need for outsourced specialized testing
grant or project to study aging arrest
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#9] Twelve guards total (6 per site) to cover 24/7 shifts and rotation; headcount directly matches the security wage estimate. |
| Medical Officer / Anesthesiologist | 2 | [#11, #12] Two licensed physicians/anesthesiologists (one per site) covered by on-call retainer and part of medical staffing costs. |
| Nurse / Medical Staff | 2 | [#12] Two nurses (one per site) providing routine care and support for sedation/ICU contingencies; included in medical staffing estimate. |
Confidence Notes
Many line items were provided with ranges; core recurring categories (security, medical, monitoring) are well-described but contingency events and Site-35 construction are highly uncertain, so estimates are mid-range and thus medium confidence.