SCP-2406
Safe
~
medium confidence
SCP-2406
Expected annual
$15.5M
One-time setup
$197.3M
Annual recurring
$14.5M
Personnel
62
Initial capital expenditures are dominated by a bespoke, radiologically shielded containment hangar and associated civil works (~$112M) plus specialized heavy equipment and contingency reserves, producing total one-time startup costs nearing $197M. Annual operations are driven by staff wages, active monitoring, logistics/rotation and thermal/power needs, totaling roughly $14.5M/yr in a low-intervention baseline.
One-Time Capital Costs
Total: $197.3M
Annual Recurring Costs
Total: $14.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$14.5M/yr
Normal year with steady containment, routine monitoring, and no major incidents.
no_major_incident
routine_operations
🚨
Minor Incident
$16.0M/yr
Localized contamination or small structural failure requiring emergency response, short-term remediation and extra monitoring.
localized_radiation_release
small_structural_failure
🚨
Major Breach
$54.5M/yr
Significant uncontrolled release, structural collapse, or event requiring large-scale entombment/salvage and contingency fund deployment.
reactor_uncontrolled_release
major_structural_failure
large_scale_salvage
Personnel
62 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 28 | [#3] Permanent perimeter security staffing across shifts; estimate based on 3×8 guards + supervisors. |
| Research Scientist | 6 | [#4] Senior scientists (metallurgy, reactor physics, archaeology, linguistics) from analyst staffing example. |
| Research Technician / Lab Tech | 10 | [#4] Technical staff for instrumentation, drilling support, conservation assistance. |
| Administrative Staff / Security Liaison | 6 | [#4] Admins, site liaisons and clerical support from analyst example. |
| Local Maintenance & Support (drivers, cooks, groundskeepers) | 8 | [#20] Cover-facility local hires for plausible military façade and site upkeep. |
| Emergency Response / Medical Officer | 4 | [#21, #28] On-site hazmat/fire/medical team members for incident response and routine medical surveillance. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs enabling a reasoned mid-range estimate, but large uncertainties remain in final containment construction costs, the feasibility/cost of entombment, and the probability/scale of rare catastrophic events.