SCP-2421
Euclid
~
medium confidence
SCP-2421
Expected annual
$18.1M
One-time setup
$38.2M
Annual recurring
$17.5M
Personnel
200
Initial capital setup is estimated at approximately $38.2M, driven primarily by land acquisitions, resort construction, large surveillance/equipment purchases, and a liquid contingency reserve. Ongoing annual operations run roughly $17.5M/year, dominated by staff wages (MTF, security, and research), D-Class program costs, surveillance/data processing, and international/incident contingencies.
One-Time Capital Costs
Total: $38.2M
Annual Recurring Costs
Total: $17.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$17.5M/yr
Normal operational year with no major incidents or authorized direct interventions; routine surveillance, feeding-area operation, and scheduled maintenance proceed as planned.
no breaches
no foreign feed events
no excavation campaigns
🚨
Minor Incident
$17.9M/yr
Small-scale civilian exposure or an isolated containment-adjacent incident requiring localized cover-up, payouts, extra legal work and short-term increased surveillance.
civilian consumed outside resort
local media attention
small forensic cleanup
🚨
International Deployment
$20.5M/yr
A feeding event or credible threat occurs outside the primary containment zone requiring covert overseas deployment and asset purchase/rental.
feed reported abroad
overseas civilian casualty
rapid covert asset deployment
🚨
Excavation Campaign
$37.5M/yr
Authorized campaign to attempt direct intervention (drilling/TBM or sustained large-bore operations) to access SCP-2421's subsurface chambers.
policy shift to active intervention
significant containment failure
extended shift in feeding pattern
Personnel
200 total
| Role | Count | Notes |
|---|---|---|
| Mobile Task Force Agent / MTF Alpha-2 | 40 | Primary operational team responsible for site operations, feeding-area maintenance and emergency response. (See #7) |
| Security Officer | 48 | Armed perimeter guards and response teams across sites, rotating shifts to provide 24/7 coverage. (See #9) |
| Research Scientist | 12 | Xenobiologists, geologists, imaging specialists and lab techs working on SCP-2421 analysis. (See #12) |
| Medical Officer | 6 | On-call medics, mortuary and necropsy staff for on-site response and autopsies. (See #11) |
| Engineer / Maintenance | 8 | Electrical/mechanical staff for pool heating, generators, vehicles and facility maintenance. (See #3, #15) |
| Administrative Staff | 24 | Receptionists, cleaners, hospitality cover staff and IT to maintain the resort cover story. (See #8, #17) |
| Class-D Personnel | 60 | Active D-Class stationed at feeding areas used as bait; costs booked under D-Class program. (See #10) |
| Site Director / Executive Staff | 2 | Senior managers overseeing operations and liaison with higher Foundation command. |
Confidence Notes
Estimates are drawn directly from analyst ranges and the SCP text; many line items have wide ranges (local variance, covert premium, and contingency-driven capital). Personnel and recurring operating costs are better-grounded than contingency excavation or international deployment costs, hence medium confidence.