SCP-243
Unknown
✓
high confidence
SCP-243
Expected annual
$1.9M
One-time setup
$3.7M
Annual recurring
$1.9M
Personnel
12
Initial one-time setup is dominated by facility construction, contingency reserve and heavy equipment (incinerator, robotics, environmental controls) totaling several million dollars; recurring costs are driven by staff wages, incineration/contracted services, research/monitoring and insurance (~$1.9M/yr).
One-Time Capital Costs
Total: $3.7M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal operational year with no containment incidents; all recurring services run as scheduled.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$2.0M/yr
Small localized event (battery leak, small fire, single flock requiring incineration) requiring contracted response and modest repairs/consumables.
small_battery_fire
single_flock_containment
🚨
Major Breach
$2.4M/yr
Significant containment breach or mass-animation event requiring mass incineration, temporary facility repairs and increased staffing/contractor hours.
multiple_flock_events
structural_damage
mass_incineration
🚨
Catastrophic Breach
$3.9M/yr
Severe event requiring invocation of contingency reserve: mass loss, major rebuild, evacuation, and long-term remediation.
facility_compromise
cross-contamination_with_high-value_SCPs
large-scale_flock_production
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#11] Six full-time guards (24/7 coverage across three shifts) plus one supervisor; wages and benefits included in staff_wages. |
| Containment Technician | 3 | [#12] Three full-time containment technicians to handle separations, cataloging and routine maintenance; wages included in staff_wages. |
| Research Scientist | 2 | [#12] Two researchers for experiments and oversight; wages included in staff_wages. |
Confidence Notes
Analyst notes provide detailed, line-item cost ranges for nearly all categories, allowing midpoint-based estimates; residual uncertainty remains in incident probabilities and contingency sizing but baseline recurring costs are well-specified.