SCP-2444
Euclid
~
medium confidence
SCP-2444
Expected annual
$3.0M
One-time setup
$2.8M
Annual recurring
$2.8M
Personnel
12
One-time capital and capability builds (detection platform, storage, vehicles, specialized instrumentation, and expanded Reliquary space) total approximately $2.84M; annual recurring costs driven by research, operations (detection hosting, analysts, MTF deployments), demolition/abatement, legal/OPSEC and program overhead total about $2.832M/yr.
One-Time Capital Costs
Total: $2.8M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal operational year with 2–7 manifestations handled without major incident; recurring detection, research, deployments, demolition/abatement and routine legal/OPSEC costs.
2-7 routine manifestations
no large-scale casualty or litigation
no catastrophic structural event
🚨
Minor Incident
$3.0M/yr
A larger-than-average manifestation requiring elevated demolition/abatement, extra amnestic sessions, additional legal/cleanup and a few expensive recoveries.
large crowd/complex site
additional demolition and abatement
heightened legal/cleanup needs
🚨
Major Breach
$4.3M/yr
Single large manifestation causing mass amnesticization, controlled implosion of a commercial structure, prolonged litigation and activation of catastrophic reserves.
mass-casualty or mass-exposure event
large commercial property demolition
major litigation and restitution
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | [#14] Core research staff included in research_and_monitoring budget (materials analysis, experiments). |
| Lab Technician | 1 | [#14] Laboratory technician support for analyses and sample handling. |
| Analyst / Operator | 3 | [#3] Dedicated I/O-VID analysts/operators (2–4 FTEs at ~$100k each). |
| Medical Officer / Psychologist | 2 | [#10] Amnesticization capability requires trained medical staff and psychologists to administer and monitor sessions. |
| Site Program Manager / Executive Staff | 1 | [#28] Program manager and executive oversight included in program management and overhead. |
| Administrative Staff | 1 | [#28] Procurement/accounting/administrative support associated with program overhead. |
| Engineer / Maintenance | 1 | [#6, #8] Maintenance and engineering support for vehicles, surveillance systems and facility equipment. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most cost centers, enabling reasonable point estimates; however wide per-event variability (manifestation size, frequency 2–7/yr, demolition/abatement uncertainty, and potential for seven-figure single events) lowers confidence from high to medium.