SCP-2464
Keter
~
medium confidence
SCP-2464
Expected annual
$11.9M
One-time setup
$194.2M
Annual recurring
$11.2M
Personnel
117
Initial one-time capital and containment buildout dominated by an on-site nuclear custody vault and heavy civil works (~$194M one-time); ongoing yearly operations are driven by staffing, specialized research and logistics (~$11.17M/yr).
One-Time Capital Costs
Total: $194.2M
Annual Recurring Costs
Total: $11.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.2M/yr
Normal operational year with scheduled maintenance and no major incidents.
scheduled_maintenance
routine_research
no_breach_events
🚨
Minor Incident
$12.2M/yr
Localized breach or maintenance accident requiring emergency response, remediation and some equipment replacement.
localized_breach
equipment_failure
minor_contamination_event
🚨
Catastrophic Breach
$71.2M/yr
Failure of SCP-2464-4 leading to SCP-2464-3 expiration and partial/total release risk requiring collapse/detonation and major remediation/legal costs.
SCP-2464-4_failure
SCP-2464-2_release
nuclear_detonation_or_large_scale_collapse
Personnel
117 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 75 | [#7] 24/7 manning across five checkpoints plus roving patrols; count based on 4 guards per checkpoint per shift × 3 shifts plus spares. |
| Quick Reaction Force / Tactical Team | 12 | [#8] Dedicated tactical/QRF contingent for breach response, explosives and hazmat interventions. |
| Research Scientist | 6 | [#11, #10] Research staff focused on SCP-2464-4 restoration, bioscience of SCP-2464-3 and interpretation of historical notes. |
| Engineer / Maintenance | 6 | [#4, #10] Mechanical and civil engineers for heavy rigging, slab handling and ongoing site/equipment maintenance. |
| Medical Officer | 3 | [#14] On-site medics/paramedics for immediate casualty care and coordination with Site 81 surgical capability. |
| Administrative Staff | 4 | [#7, #24] Site administration, legal/cover-story coordination and records/redaction staff. |
| Site Director / Executive Staff | 1 | [#9] Senior containment oversight and classified-clearance management. |
| Class-D Personnel | 10 | [#15] D-class rotation/housing supported on-site (count is operational average; costs appear under Class D program support rather than staff wages). |
Confidence Notes
Line items are well-covered with order-of-magnitude ranges, but large uncertainties remain around choice/implementation of an on-site nuclear option, site-specific construction costs, and tail-risk event frequencies which drive high-cost scenarios.