SCP-2480
Safe
~
medium confidence
SCP-2480
Expected annual
$11.5M
One-time setup
$43.4M
Annual recurring
$11.4M
Personnel
46
One-time capital costs are dominated by construction of Site-13 and research lab/equipment; recurring costs are driven by embedded personnel/MTF readiness, research operations, community integration, and a standing contingency fund. Total one-time outlay is roughly $43.4M with recurring annual operations around $11.4M.
One-Time Capital Costs
Total: $43.4M
Annual Recurring Costs
Total: $11.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.4M/yr
Normal operational year with routine research, embedded operations and no significant Emanation Events or exposures.
routine operations
no Emanation Events
no public exposure
🚨
Minor Incident
$11.7M/yr
Localized Emanation Event requiring limited site repairs, targeted amnestic campaign, contractor cleanup and temporary surge staffing.
localized Emanation Event
minor structural or equipment damage
small-scale amnestic ops
🚨
Major Breach
$13.9M/yr
Significant Emanation Event or larger containment breach requiring major repairs, mass amnestics, extended contractor engagement and legal responses.
major Emanation Event
extensive structural damage
widespread civilian exposure
🚨
Catastrophic Exposure
$21.4M/yr
Full-site compromise or public exposure leading to large settlements, major rebuilding, national-level response and extended remediation.
full-site compromise
mass public exposure
extended multi-agency remediation
Personnel
46 total
| Role | Count | Notes |
|---|---|---|
| Embedded Staff (cover identities) | 20 | [#5] Foundation personnel integrated into the town as full-time covers (teachers, shopkeepers, municipal roles). |
| Security Officer / MTF Agent (Epsilon-6) | 14 | [#6] Infiltrated operators maintaining continuous on-site/embedded tactical presence and rotation. |
| MTF Psi-9 operatives (on-call/standby) | 12 | [#7] On-call rapid-response MTF maintained at high readiness (statewide/national standby posture paid for via recurring readiness costs). |
Confidence Notes
Estimates use midpoints from analyst ranges and combine many recurring items; costs are well-scoped by the notes but include uncertainty around incident frequency, contractor rates, and the scale of necessary response, so confidence is medium.