SCP-2498 Neutralized ~ medium confidence
SCP-2498
Expected annual
$1.9M
One-time setup
$16.2M
Annual recurring
$1.8M
Personnel
14
Initial one-time capital is approximately $16.16M, driven primarily by heavy lead shielding, installation/structural reinforcement, and an optional full relocation contingency; annual recurring operations are about $1.83M/yr, driven by specialized staff wages, security, research/monitoring, and an operational contingency reserve.
🏗️ One-Time Capital Costs Total: $16.2M
Full Relocation Hardened Site $10.0M
[#25] Contingent/optional one-time cost to fully relocate containment to a hardened Foundation Site (site construction, secure transport and rebuild).
Facilities $3.3M
[#1, #2, #3, #4, #17] Lead purchase and containment structural work: lead material, shielding installation/labor, structural reinforcement to support ~250 t, sealed/blast doors and airlock, and heavy-transport/customs handling.
Decommissioning And Disposal Fund $1.0M
[#18] Up-front decommissioning / hazardous waste disposal allocation (one-time fund to be escrowed for eventual removal of lead and remediation).
Initial Research And Lab Setup $995K
[#12, #13, #14] Research-specific buildout and instruments: remote/robotic manipulators and safe-test rigs, scientific instrumentation (high-speed cameras, gravimeters, spectrometers, EEG rigs, etc.), and initial PPE/autoclave/access to decon equipment.
Equipment $699K
[#5, #6, #7, #8, #15] Installed systems and hardware: HVAC/climate control and ductwork, initial radiation-monitoring hardware and personal dosimeters, remote observation/communication suite, secure servers/electronics, emergency response vehicle and gear.
Legal Permitting Initial $150K
[#16] Initial legal/permitting/lease setup and cover-story establishment costs for university footprint and construction permits.
Initial Vetting And Clearance $40K
[#22] Initial background investigations, psychological screening, and Level-3 clearance setup costs.
🔄 Annual Recurring Costs Total: $1.8M/yr
Staff Wages $746K/yr
[#9, #10] Salaries: 3security staffing (three shifts + supervisors) and specialized scientific payroll (two Level-3 researchers, RSO, site director/administrator, technicians).
Research And Monitoring $352K/yr
[#6, #8, #12, #13, #23] Ongoing research and monitoring costs: dosimeter calibration & replacements, secure hosting/backups/cybersecurity, maintenance of remote manipulators and test rigs, instrumentation calibration/consumables, and discretionary research/standby experiments budget.
Contingency Reserve $200K/yr
[#20] Insurance/contingency/high-risk anomaly reserve (operational contingency fund for unplanned breaches, experiments, or legal contingencies).
Logistics And Transport $150K/yr
[#11, #15] Travel, rotations, and emergency readiness: specialist travel/lodging/per-diems to respect 240 hr/yr on-site limit, plus hazmat team training/readiness and vehicle upkeep for emergency response.
Cover Story And Legal $120K/yr
[#16, #21] Ongoing lease/retainer/legal fees and cover-story/publications expense to maintain plausible academic presence and local relationships.
Decommission Escrow $100K/yr
[#18] Annual escrow funding toward long-term decommissioning and hazardous waste disposal (amortized funding recommendation).
Facilities Maintenance $81K/yr
[#5, #7, #24] Facility upkeep: HVAC maintenance & filter replacement, observation-room/system maintenance, and local utilities/grounds upkeep and janitorial services.
Medical Surveillance $35K/yr
[#14] Ongoing medical surveillance, periodic bloodwork, immunizations, and access to decontamination/autoclave services.
Supplies And Consumables $25K/yr
[#19] Routine consumables: gloves, filters, batteries, spare sensors, calibration gases, small electronics replacement.
Training And Clearance $25K/yr
[#22] Ongoing specialty training, annual refresher courses, and clearance processing for Level 3-2498 staff.
Cost Scenarios
📊 Baseline (baseline) $1.8M/yr
94.0% probability / year
Normal uneventful year with routine operations, monitoring, and scheduled maintenance.
no containment incidents routine equipment maintenance scheduled research activity
🚨 Minor Incident $2.2M/yr
5.0% probability / year +$350K vs baseline
Localized containment/engineering incident requiring emergency repairs and increased testing but not full breach.
small shielding breach or localized lead plate failure equipment damage requiring replacement targeted repair and additional monitoring
🚨 Major Breach $6.8M/yr
1.0% probability / year +$5.0M vs baseline
Significant containment failure or hostile breach forcing major remediation, possible temporary relocation, and large-scale emergency response.
forced entry / coordinated hostile operation loss of containment requiring decontamination decision to relocate or rebuild containment
👥 Personnel 14 total
Role Count Notes
Security Officer / MTF Agent 8 [#9] 24/7 physical security coverage with three shifts plus supervisors.
Research Scientist 2 [#10] Two Level-3 researchers authorized to communicate with SCP-2498.
Radiation Safety Officer (RSO) 1 [#6, #10] Dedicated RSO for dosimetry, calibration oversight, and radiation safety procedures.
Technician / Lab Technician 2 [#10, #12] Maintenance of instrumentation, remote manipulators, and regular calibration/consumables handling.
Site Director / Administrator 1 [#10, #16] Site leadership and liaison, administrative oversight, and cover-story coordination.
📋 Confidence Notes
Estimates are based on detailed analyst line-item ranges and a realistic containment footprint in Andhra Pradesh, but uncertainty remains due to the unknown limits of SCP-2498's anomalous abilities (which could require additional redundancy or relocation) and variability in local vs. international pay rates.
← SCP-2497 ↑ All SCPs SCP-2499 →