SCP-251
Euclid
~
medium confidence
SCP-251
Expected annual
$1.2M
One-time setup
$1.9M
Annual recurring
$1.1M
Personnel
15
Initial one-time containment and equipment setup is moderate (~$1.91M) with primary one-time drivers being defensive/tactical kit-up and contingency capital; recurring annual costs are significant (~$1.136M/yr) driven mainly by 24/7 armed staffing, ongoing research, and legal/cover-up reserves.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no major incidents; containment operates as planned with regular maintenance, staffing, and research.
no_incident
routine_operations
🚨
Minor Incident
$1.4M/yr
Single localized containment failure or staff-left-alone event requiring tactical response, cleanup, and modest cover-up/legal action.
single_insider_procedure_failure
minor_leak_or_local_exposure
🚨
Major Breach
$2.3M/yr
Significant containment breach or high-visibility incident requiring large-scale response, substantial legal/PR expenses and possible capital escalation (e.g., remote bunker).
protocol_failure_with_public_exposure
multiple_staff_casualties
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | Armed guards covering 24/7 two-person rule (8 total to staff shifts and leave). Payroll included in staff_wages. |
| Research Scientist | 3 | Research staff performing controlled experiments and monitoring; covered under research_and_monitoring recurring costs. |
| Engineer / Maintenance / Tactical Technician | 2 | On-call rapid-response/tactical capability and equipment maintenance; equipment kit-up and logistics costs included. |
| Medical Officer / Forensic Technician | 1 | On-call medical/forensic readiness for violent incidents; equipment and recurring supplies budgeted. |
| Administrative Staff / Compliance | 1 | Handles audits, documentation, legal liaison and record-keeping; contributes to cover-story/legal readiness. |
Confidence Notes
Notes provide detailed line-item ranges enabling mid-range estimates, but many per-incident and contingency costs are highly uncertain (cover-up/legal, frequency of incidents, decision to build hardened bunker), so overall confidence is medium.