SCP-2516
Euclid
✓
high confidence
SCP-2516
Expected annual
$1.5M
One-time setup
$3.3M
Annual recurring
$1.5M
Personnel
13
Initial one-time setup is roughly $3.31M driven by legal/sovereign access, heavy construction, robotics procurement and a large contingency reserve; recurring operations are ~ $1.465M/yr driven primarily by on-site security and technical staffing, telemetry/monitoring, and ongoing liaison/cover costs.
One-Time Capital Costs
Total: $3.3M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal uneventful operational year with routine missions, maintenance, and liaison activity.
routine_operations
no major incidents
🚨
Minor Incident
$1.7M/yr
Minor damage to robotic systems or sensors, requiring replacement/repair and small emergency response.
robot_failure
localized sensor damage
small field rescue
🚨
Major Breach
$3.0M/yr
Significant structural failure or anomaly escalation requiring heavy emergency construction, large remediation and extended operations.
structural_collapse
large_scale_anomalous_manifestation
need_to_reseal_or_excavate
🚨
Political Exposure
$2.0M/yr
Local discovery or diplomatic breach forcing large legal settlements, expanded cover-up operations and increased monitoring.
public_discovery
government_demands_compensation
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#11] Six guards to provide 24/7 coverage (two 12-hour shifts). |
| Security Supervisor | 1 | [#11] Site security supervisor and oversight. |
| Site Director / Executive Staff | 1 | [#12] Site manager responsible for operations and liaison. |
| Engineer / Maintenance | 2 | [#12] Two field technicians for robotics/IT and site maintenance. |
| Research Scientist | 2 | [#12] Two researchers: physics/gravity specialist and linguist/historian for document analysis. |
| Medical Officer | 1 | [#12, #14] Part-time medic/paramedic retainer (counted as a single on-call FTE for headcount purposes). |
Confidence Notes
Analyst notes provide line-item estimates for each major cost driver (construction, robotics, staffing, liaison and contingencies), allowing a well-constrained budget; uncertainty remains for government demands or large anomaly escalations but baseline recurring and one-time estimates are detailed.