SCP-2596 Euclid ~ medium confidence
SCP-2596
Expected annual
$2.7M
One-time setup
$682K
Annual recurring
$2.6M
Personnel
16.2
Initial setup costs are moderate (~$682k) driven by containment retrofit, sump/tank installation, and equipment; annual operating costs are dominated by staffing and hazardous-liquid disposal at approximately $2.61M/yr.
🏗️ One-Time Capital Costs Total: $682K
Facilities $280K
[#1, #2, #15] Containment chamber retrofit, underground storage/sump installation, and HVAC/dehumidification upgrade (mid-range estimates aggregated).
Incident Reserve One Time $200K
[#22] Recommended contingency/reserve for emergency containment, specialized contractors, or one-off decontamination operations.
Equipment $110K
[#3, #11, #24, #25] Sump pumps/piping and corrosion-resistant fittings, waterproof CCTV/hardware, specialized EEG/fMRI-access instrumentation (purchase or initial rental), and initial surface stabilization fixtures.
On Site Treatment Setup $30K
[#4] One-time setup for on-site chemical sterilization treatment system and initial permitting (if chosen over full contracted hauling).
Conservation And Preservation Initial $22K
[#14] Initial assessment and stabilization/conservation work for the water-damaged wooden raft (non-invasive supports, humidity staging).
Data Infrastructure Initial $20K
[#20] Initial secure archival/encryption/backups and local storage hardware for CCTV and experiment logs.
Legal And Permits One Time $20K
[#16] Initial permit fees, municipal liaison, and cover-story establishment costs (mid-range estimate).
Initial Research And Lab Setup $0
[#5] Baseline assumes use of existing external BSL testing facilities; full on-site BSL-3 upgrade (1M–3M) is not purchased in baseline year and is handled as an adverse scenario if required.
🔄 Annual Recurring Costs Total: $2.6M/yr
Staff Wages $1.8M/yr
[#6, #7, #8, #9] Security guards (8 FTEs), containment technicians (3 FTEs), on-site medical staff (nurse/EMT + part-time physician contracts), and research staff (project lead + ~3 researchers/clinicians) aggregated.
D Class Program $450K/yr
[#10] Housing, feeding, medical screening and administration for D-class personnel (baseline assuming ~10 active D-class at mid-range cost).
Research And Monitoring $118K/yr
[#5, #20, #24] Routine sample processing and testing using external BSL facilities (~$100k/yr baseline), recurring data archival costs, and operational costs for hallucination research equipment/analysis.
Waste Disposal $100K/yr
[#4] Baseline assumes moderate on-site chemical treatment + permits and recurring chemical/monitoring costs (mid-range ~$100k/yr). Contracted hauling option would be significantly higher and is modeled in adverse scenarios.
Supplies And Consumables $35K/yr
[#12] PPE, decon supplies, medical consumables, single-use dressings and disposables (mid-range annual consumption).
Psychological Aftercare $30K/yr
[#21] Counseling, personnel reliability monitoring and employee assistance programs for staff exposed to traumatic events/hallucinations.
Logistics And Transport $20K/yr
[#18] Secure transport, specialist consultations, and occasional off-site testing/transfer costs (annual budget for periodic transports).
Forensic Handling $18K/yr
[#13] Evidence bagging, cataloguing, cold storage, and occasional special analyses (DNA, material analysis).
Facilities Maintenance $17K/yr
[#3, #15] Routine maintenance for pumps/piping, backflow prevention, HVAC/dehumidification, and corrosion control (includes pump maintenance mid-range).
Emergency Drills $15K/yr
[#17] Regular hazard-response drills, overtime, and simulation materials.
Archival And Memorialization $10K/yr
[#23] Forensic archiving of personal effects and low-frequency coverup/records work for vanished subjects (annual budget for occasional incidents).
Data Infrastructure Recurring $8K/yr
[#20] Encryption, backups, archival storage fees, and secure off-site replication.
Cover Story And Legal $5K/yr
[#16] Ongoing liaison, false invoices/cover-story maintenance, and permit renewals (baseline minimal recurring estimate).
Conservation Monitoring $5K/yr
[#14] Periodic monitoring and small repairs for raft conservation and humidity control systems.
Energy Usage $5K/yr
[#19] Incremental electricity for continuous pumping, HVAC dehumidification and lab equipment (mid-range).
Cctv Storage And Maintenance $3K/yr
[#11] Redundant recording storage, waterproof camera maintenance and software upkeep.
Replacement And Repairs Recurring $3K/yr
[#25] Ongoing inspection, minor repairs and consumables for raft supports and non-invasive fixtures.
Cost Scenarios
📊 Baseline (baseline) $2.6M/yr
85.0% probability / year
Normal operating year with routine maintenance, weekly disposal via on-site treatment and no major incidents.
routine_weekly_disposal regular_staffing_and_maintenance no containment incidents
🚨 Minor Spill $2.9M/yr
10.0% probability / year +$260K vs baseline
Localized pump/piping failure or short-term overflow requiring emergency cleanup and temporary contracted hauling.
pump_failure temporary overflow short-term contracted disposal
🚨 Major Breach And Contamination $3.9M/yr
3.0% probability / year +$1.2M vs baseline
Significant containment breach or contamination event requiring full external hazardous decontamination, extended disruption, and forensic/legal response.
containment_breach sewer/municipal exposure external_decontamination
🚨 Bsl Upgrade Required $4.5M/yr
2.0% probability / year +$1.9M vs baseline
Discovery of pathogenic/unknown agents or regulatory requirement forces a one-time on-site BSL-3 upgrade and expanded on-site treatment capacity.
pathogen_discovery regulatory_audit requirement_for_on-site_bsl3
👥 Personnel 16.2 total
Role Count Notes
Security Officer / MTF Agent 8 [#6] 6–10 guards recommended to provide 24/7 coverage; baseline uses 8 FTEs.
Containment Technician / Maintenance 3 [#7] 2–4 FTEs for daily maintenance and pump/sump checks; baseline uses 3 FTEs.
Research Scientist / Project Lead 4 [#9] Project lead + researchers/clinicians (3–6 staff total); baseline uses 4 research/clinical staff.
Medical Officer (Nurse/EMT) 1 [#8] At least one nurse/EMT present during experiments.
Medical Officer (On-call Physician, fractional) 0.2 [#8] Part-time/contracted physician coverage (on-call) represented as fractional FTE.
📋 Confidence Notes
Estimates use mid-range values from analyst notes and known fluid production; uncertainty remains high for disposal strategy choice (contracted hauling vs on-site treatment), probability of breaches, and optional BSL upgrade costs, so confidence is medium.
← SCP-2595 ↑ All SCPs SCP-2597 →