SCP-2667
Safe
~
medium confidence
SCP-2667
Expected annual
$2.2M
One-time setup
$1.4M
Annual recurring
$2.1M
Personnel
32
One-time startup capital is roughly $1.38M driven by land acquisition, construction, sensors and vehicles; annual operations are about $2.13M/year dominated by continuous armed guard wages, on-site research staff, and monitoring costs.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal year with steady operations and no major incidents; recurring operating budget only.
no incidents
standard monitoring and maintenance
🚨
Minor Incident
$2.2M/yr
Localized vandalism, weather damage, or small-scale statue damage requiring emergency conservation and modest legal/PR response.
vandalism
localized weather damage
minor public exposure
🚨
Major Breach
$2.7M/yr
Significant public exposure, multiple artifacts moved/damaged, or major legal/municipal conflict requiring large-scale recovery, compensation, and potential heavy-lift purchases or rentals.
public discovery/exposure
multiple-statue movement/vandalism
major legal action / relocation
Personnel
32 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent (Guard) | 24 | [#6] 24 guards employed to ensure 6 armed guards present at all times (3 shifts + backfill/leave). |
| Site Manager / Executive Staff | 1 | [#9] Full-time site manager responsible for operations and liaison. |
| Research Scientist | 2 | [#9] Two rotating researchers/linguists/psychologists for recording analysis and experiments. |
| Technician / Conservator | 1 | [#9, #12] One technician for evidence handling, specimen prep, and conservation coordination. |
| CCTV/Audio Operator / Analyst | 4 | [#10, #11] Dedicated monitoring/transcription/analysis staff to operate recordings and produce transcriptions; shift coverage included. |
Confidence Notes
Notes are detailed and provide clear ranges for most line items; however costs are location-dependent (land value, local wages) and containment-choice sensitive (purchase vs lease, purchase vs rental of heavy equipment), producing moderate uncertainty.