SCP-2670
Euclid
~
medium confidence
SCP-2670
Expected annual
$5.0M
One-time setup
$6.6M
Annual recurring
$4.9M
Personnel
25
Initial one-time setup is estimated at approximately $6.6M driven by facility buildout, contingency reserve, lab upgrades and equipment; recurring annual costs are approximately $4.91M driven by staff wages, MTF retainer, research, and ongoing maintenance/consumables.
One-Time Capital Costs
Total: $6.6M
Annual Recurring Costs
Total: $4.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.9M/yr
Normal operational year with routine maintenance, research, and no major incidents.
routine_operations
monthly_transports
regular_research_activities
🚨
Minor Incident
$5.2M/yr
Small-scale incident: single drone loss or localized contamination requiring MTF activation and forensic response.
drone_loss
single_mtf_activation
localized_contamination
🚨
Major Breach
$6.8M/yr
Significant containment breach or hostile escalation requiring sustained MTF deployment, large-scale amnestic use, equipment replacement and contingency activation.
sustained_mtf_deployment
mass_amnestic_campaign
site_evacuation
🚨
Political Exposure
$6.1M/yr
Public disclosure or heavy local-government involvement requiring extensive cover operations, legal settlements and emergency public-health interventions.
public_disclosure
local_authority_involvement
media_exposure
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | [#3] 24/7 guarded coverage with rotations (3–4 per shift, 3 shifts plus reserves). |
| Research Scientist | 3 | [#5] Level 2/2670 researchers (2–4) responsible for direct interactions and analysis. |
| Technician / Drone Operator | 2 | [#5, #7] Supporting technicians and drone operators for fieldwork and equipment maintenance. |
| Medical Officer | 1 | [#16] Medical staff to administer amnestics and manage medical readiness. |
| Administrative Staff | 2 | [#29] Clerical staff for documentation, logs, and record management. |
| Engineer / Maintenance | 1 | [#13, #10] Site and lab systems maintenance including power/microgrid and HVAC/containment systems. |
Confidence Notes
Analyst notes provide ranges and clear line items, allowing a reasoned baseline; however uncertainty remains regarding operational tempo (frequency of interactions), anomaly-driven equipment attrition rates, and option choices (aircraft purchase vs contract), so medium confidence is appropriate.