SCP-2717
Euclid
?
low confidence
SCP-2717
Expected annual
$10.1M
One-time setup
$57.1M
Annual recurring
$9.8M
Personnel
21
Estimated one-time buildout and contingency/decommissioning dominate capital costs (~$57.1M), while recurring annual operations are driven by controlled-substance procurement (propofol), specialist research staff, radiation operations and contingency reserves (~$9.78M/year). Major uncertainty centers on daily effluent volume which can change sterilization and municipal costs by orders of magnitude.
One-Time Capital Costs
Total: $57.1M
Annual Recurring Costs
Total: $9.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.8M/yr
Normal year under the small/benign-volume assumption with routine maintenance, daily propofol administration, testing, and reserve contributions.
routine_operations
no_major_breach
small_effluent_volume_assumption
🚨
Minor Incident
$10.3M/yr
Localized incident during pruning or sampling causing increased medical response, cleanup, temporary shutdowns and short-term remediation.
pruning_casualties
localized_breach
unexpected_biomass_growth
🚨
Industrial Volume
$21.8M/yr
Discovery/confirmation that daily effluent is large (megaliters/day), triggering industrial-scale sterilization, municipal upgrades, and large energy and coordination costs.
discovery_of_megaliter_flow
municipal_detection
need_for_industrial_irradiation
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#17] Baseline guarded 24/7 access, 4–8 FTEs estimated; mid-point used. |
| Research Scientist | 5 | [#22] Molecular biologists/histopathologists/bioengineers; salary pool budgeted for 3–6 specialists. |
| Radiation Safety Officer | 1 | [#18] Required if onsite cobalt-60 irradiator is operated; recurring RSO program costs budgeted. |
| Medical Officer | 2 | [#16] On-site medics for pruning operations and immediate response; staffing budgeted in recurring med costs. |
| Robotic Operator / Technician | 1 | [#11] Operator/support labor for robotic biopsy tool; recurring labor budgeted. |
| Engineer / Maintenance | 1 | [#3, #21] Electrical/HVAC/maintenance capability for pumps, transformers and infrastructure upgrades. |
| Class-D Personnel | 6 | [#13, #14] Three quarterly crews (2 D-class each) present during pruning operations; costs for recruitment/management are budgeted. |
Confidence Notes
Major uncertainties (the reported '20 Ml' ambiguity, the massive daily propofol volume, and the choice between benchtop vs industrial irradiation) produce order-of-magnitude variance. Many estimates are midpoints of wide ranges and depend on local (Amsterdam/EU) regulatory and municipal constraints.