SCP-2722
Safe
~
medium confidence
SCP-2722
Expected annual
$12.0M
One-time setup
$17.5M
Annual recurring
$11.8M
Personnel
73
Initial capital outlay is approximately $17.5M one-time to acquire land, build containment infrastructure, purchase heavy equipment and establish research capabilities; recurring operations are roughly $11.76M/year driven primarily by security and excavation payroll, research/compute, and continuous monitoring.
One-Time Capital Costs
Total: $17.5M
Annual Recurring Costs
Total: $11.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.8M/yr
Normal operation year with continuous monitoring, planned excavation activity, and no major incidents.
routine_excavation
scheduled_research
normal_staff_rotation
🚨
Minor Incident
$12.3M/yr
Localized psychological incidents or small unauthorized approach requiring additional medevac, short-term legal/PR response, and limited overtime replacement hires.
localized_suicide_events
minor_breach_by_civilian
small_equipment_failure
🚨
Major Breach
$16.8M/yr
Significant breach or mass psychological event causing multiple casualties, large legal exposure, major replacement hiring and equipment loss.
mass_psychological_incident
unauthorized_entry_within_half_km
aircraft_incident
🚨
Escalation Event
$21.8M/yr
Catastrophic expansion of effects or international-scale incident requiring evacuation, international coordination, and full contingency drawdown.
widespread_spillover
airspace_catastrophe
international_emergency_response
Personnel
73 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#3] 24 armed guards across 3 shifts to enforce the 5 km exclusion zone and perform patrols. |
| Excavation Crew / Operators | 20 | [#7, #8] Core excavation crew to support one-day-on/three-day-off rotations with hazard pay and backups. |
| Research Scientist / Linguist / ML Engineer | 8 | [#15, #16] Linguists, computational linguists, and ML engineers for OCR/translation and memetic research payroll. |
| Long-term Observation Team / Archivist | 8 | [#17] Researchers, archivists and analysts monitoring text additions and maintaining logs. |
| Psychiatrist / Therapist | 2 | [#9] On-site psychiatrists/therapists providing evaluations and crisis intervention. |
| Medical Officer / Paramedic | 1 | [#10] On-site medic and coordination with medevac contracts for emergency response. |
| Engineer / Maintenance | 4 | [#6, #7, #19] Robotics/operators and equipment maintenance personnel for excavation, generators and robotic systems. |
| Administrative Staff / Site Director | 2 | [#20, #21] Administrative, logistics and site-director level staff managing operations, logistics, and legal liaison. |
| Site-21 Storage & Handling Staff | 4 | [#12, #13] Staff at Site-21 responsible for receiving, cataloging, and managing transported artifacts. |
Confidence Notes
Analyst notes provide detailed line items and ranges for most cost drivers, enabling a defensible estimate; site-specific land values, choices between purchase vs rental of heavy equipment, and incident frequency introduce uncertainty, so confidence is medium.