SCP-2746
Unknown
~
medium confidence
SCP-2746
Expected annual
$3.8M
One-time setup
$2.3M
Annual recurring
$3.5M
Personnel
18
Initial one-time capital and setup costs are roughly $2.29M dominated by facility retrofits, lab buildout and equipment; ongoing annual costs are roughly $3.54M driven primarily by security and a dedicated research team, plus legal/cover costs and contingency research funding.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $3.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.5M/yr
Normal operational year with no major containment incidents; routine expeditions and research tempo maintained.
no breaches
routine expeditions
normal research activity
🚨
Minor Incident
$3.8M/yr
Localized breach attempt or vandalism requiring rapid-response capture, equipment repairs, overtime and temporary increased medical support.
vandalism/breach attempt
field capture operations
🚨
Major Breach
$13.5M/yr
Significant containment failure or persistent active threat from SCP-2746-1 requiring extended response, large-scale retrofits and long-term containment upgrades.
sustained breach
escalation to hardened containment
🚨
Research Scale Up
$4.3M/yr
Breakthrough or priority research campaign requiring rapid staffing increases, additional equipment purchases and expanded expedition tempo.
critical research finding
external tasking to scale studies
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#1] 24/7 guard presence for SR 111-1 (guards + supervisors + site monitor). |
| Research Scientist | 4 | [#7, #14, #15] Xenobiologists/archaeologists/analysts and lab staff supporting diagnostics, sequencing and artifact conservation. |
| Veterinary / Medical Officer | 1 | [#7, #13, #24] Veterinary/medical specialist for pre/post-transformation care and emergency procedures; includes counseling linkages. |
| Field Technician | 2 | [#8, #11, #12] Short-term expedition field crew and technicians handling animal-tailored gear, collars, and field cameras. |
| Site Manager / Monitor | 1 | [#1, #19] On-site manager/operator coordinating access point, logistics and transport scheduling. |
| Administrative / IT / Logistics | 1 | [#20, #21, #22] Admin for cover-story management, liaising with local authorities, and IT/sysadmin support for secure data systems. |
Confidence Notes
Estimates are built from the analyst's ranges and typical Foundation unit costs; many line items have wide ranges or policy-dependent choices (lease vs purchase, buy vs contract imaging), so uncertainty is moderate.