SCP-275
Safe
~
medium confidence
SCP-275
Expected annual
$1.3M
One-time setup
$1.6M
Annual recurring
$1.3M
Personnel
8.2
Initial capital requirements are approximately $1,615,000 driven mainly by construction, lab instrumentation and specialized equipment (laser, HVAC, secure doors/elevator). Recurring annual costs are about $1,303,000, dominated by staff wages, ongoing research, hazardous-waste disposal and maintenance.
One-Time Capital Costs
Total: $1.6M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with scheduled operations, routine research, no major incidents.
no_incident
regular_research
routine_maintenance
🚨
Minor Incident
$1.4M/yr
Subject damages fixtures or containment fittings during self-destructive episode requiring repairs and overtime.
property_damage
localized_repairs
overtime_lab/cleaning
🚨
Research Scaleup
$1.6M/yr
Significant research breakthrough or decision to bring more instrumentation/staff in-house, requiring capital expenditure and hiring.
scale_up_research
additional_equipment_purchase
🚨
Major Breach
$2.8M/yr
Serious public exposure / containment failure requiring emergency response, relocation, legal defense and major repairs.
large_scale_damage
public_exposure
relocation/legal_response
Personnel
8.2 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] Minimum pool of six specialized operatives to ensure two armed operatives available for escorted access and 24/7 coverage (#7). |
| Research Scientist (senior, part-time FTE) | 0.2 | [#8] Level-4 oversight and specialist research staffing prorated FTE allocated to SCP-275 (partial FTE) (#8). |
| Research/Technical Staff (laser/grinder technician) | 1 | [#10, #11, #12] Dedicated technician for laser operation, grinder operations, tool maintenance and safety (1.0 FTE) (#10, #11, #12). |
| Medical Officer / Nurse | 1 | [#9] On-site medical/psychiatric care personnel for routine vitals, emergency response and behavioral therapy coordination (#9). |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs, allowing a reasonable mid-range estimate, but several items (lab capital, research burn rate, staffing allocations, and contingency for unpredictable subject behavior) have wide ranges and scenario-dependent variability, so confidence is medium.