SCP-2829
Euclid
~
medium confidence
SCP-2829
Expected annual
$2.3M
One-time setup
$2.3M
Annual recurring
$2.3M
Personnel
14
Initial one-time setup approximately $2.26M driven by containment construction, specialized HVAC, PPE and research startup; annual operations roughly $2.25M driven primarily by staff wages, research/monitoring, and administrative overhead.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $2.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.3M/yr
Normal year with routine operations, no major incidents.
routine_staffing
regular_research
no_incidents
🚨
Minor Incident
$2.5M/yr
Localized medical incident (single accidental fusion or adverse reaction) requiring ER-level care, overtime and legal/cleanup expenses.
accidental_fusion
acute_medical_treatment
extra_decontamination
🚨
Major Breach
$3.8M/yr
Significant containment breach or multiple exposures requiring large-scale medical response, public-health coordination, legal settlements and rapid expansion of containment capacity.
multi-person_exposure
public_exposure
containment_failure
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician | 4 | [#5] Three full-time containment technicians plus one part-time backup (FTE-equivalent staffing to cover rotations and monthly psychological evaluations). |
| Research Scientist / Lead Biologist | 1 | [#6] One lead scientist dedicated to SCP-2829 research. |
| Research Technician | 1 | [#6] One research technician supporting experiments and assays. |
| Veterinarian / Biomedical Specialist | 1 | [#7] Medical/veterinary specialist for specimen health, anesthesia and procedures. |
| Security Officer / MTF Agent | 6 | [#8] Six on-site guards to provide 24/7 coverage and biohazard-trained rotations. |
| Medical Officer / Psychiatrist (oversight) | 1 | [#9] Physician oversight for depressant regimens and monthly psychological evaluations (contract or part-time). |
Confidence Notes
Analyst notes provide detailed line-item ranges and staffing assumptions, enabling a moderately well-constrained estimate; significant uncertainties remain in construction scope (retrofit vs new), frequency of budding/newborn capture load, and research/assay costs, so point estimates use mid-range choices.