SCP-2834
Unknown
~
medium confidence
SCP-2834: The Blood of MEKHANE
Expected annual
$4.7M
One-time setup
$6.9M
Annual recurring
$4.6M
Personnel
21
One-time capital (containment vessel, HVAC retrofit, non-metallic retrofits, optional research instruments and emergency reserves) is roughly $6.9M; recurring annual costs are dominated by research staff, continuous monitoring/security, and instrument access, totaling about $4.55M/yr.
One-Time Capital Costs
Total: $6.9M
Annual Recurring Costs
Total: $4.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.6M/yr
Normal operational year with no major containment incidents; routine monitoring, research, maintenance and occasional small drills.
normal operations
scheduled maintenance
planned research activity
🚨
Minor Incident
$5.1M/yr
Localized containment anomaly or small leak requiring rapid response, limited MTF deployment, short-term emergency procurement and increased disposal and decon costs.
small containment breach
sensor/tubing failure
localized contamination
🚨
Major Breach
$8.1M/yr
Significant containment failure requiring Protocol 2834-06a activation, wide MTF mobilization, large-scale emergency expenditures, possible replacement/upgrades.
full containment failure
SRA malfunction or power loss
hostile recovery by external actors
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 6 | [#17] Senior containment/materials researchers responsible for experiments and SRA coordination. |
| Research Technician | 2 | [#17] Lab technicians supporting sample prep and instrument operation. |
| Monitoring Technician / Operator | 6 | [#5] 24/7 monitoring staff (operators/technicians) covering three shifts. |
| Security Officer / MTF Agent | 7 | [#6] Dedicated armed guards/rapid response team assigned to containment and locker wings. |
Confidence Notes
Notes provide detailed line-item ranges for most categories, but many items (research program scale, optional instrument purchases, emergency reserve sizing and mission frequency) have wide ranges and epistemic uncertainty; totals are mid-range estimates.