SCP-2889
Keter
~
medium confidence
SCP-2889
Expected annual
$47.2M
One-time setup
$104.4M
Annual recurring
$45.7M
Personnel
120
First-year capital and setup costs are dominated by facility construction, neutralization/relocation contingencies, and initial research (~$104.4M one-time). Ongoing annual operations are driven by security payroll, rotation premiums, medical monitoring, MTF readiness, and contingency reserves (~$45.7M/yr).
One-Time Capital Costs
Total: $104.4M
Annual Recurring Costs
Total: $45.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$45.7M/yr
Normal year with routine operations, no major incidents or large one-time actions.
routine_operations
no_major_breaches
🚨
Minor Incident
$48.2M/yr
Localized breach or surge in trespassers requiring extra deployments, medical responses, and legal actions.
trespasser_influx
localized_breach
product_recall_detection
🚨
Forced Relocation
$76.7M/yr
Decision to buy out or permanently relocate Freshwater residents; major one-time compensation and relocation operations occur this year.
political_decision_to_buyout
failed_quarantine
escalating_resistance
🚨
Neutralization Event
$110.7M/yr
Large-scale neutralization/eradication or entombment operation for SCP-2889 requiring industrial-scale engineering and remediation.
policy_to_neutralize
environmental_engineering_operation
Personnel
120 total
| Role | Count | Notes |
|---|---|---|
| Security Officer | 90 | [#2] Active posts staffing estimate (approx. 10 posts staffed continuously with 3 guards/post/shift). |
| Command/Relief/Admin | 30 | [#2] Command, relief, rotations and administrative rostering included in the overall 120-person security roster. |
Confidence Notes
Many line items have well-defined ranges (security payroll, surveillance, vehicles), but key drivers (town buyout, neutralization cost, long-term research timeline) possess high uncertainty; mid-range estimates used where ranges were wide.