SCP-2922
Euclid
~
medium confidence
SCP-2922
Expected annual
$4.8M
One-time setup
$3.8M
Annual recurring
$4.7M
Personnel
24
Estimated one-time setup costs approximately $3,761,000 for containment build-out, initial legal/reserve funding and research/lab setup; recurring operating costs approximately $4,708,675/year driven primarily by 24/7 staffing, research salaries/instrumentation, medical/legal reserves and contingency.
One-Time Capital Costs
Total: $3.8M
Annual Recurring Costs
Total: $4.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.7M/yr
Normal, uneventful year with standard operations and scheduled research activity.
no major incidents
routine research cadence
standard staffing and maintenance
🚨
Minor Incident
$5.0M/yr
Localized incident (e.g., staff exposure, limited memetic leak, equipment failure) requiring additional medical/legal response and partial equipment replacement.
medical/psychiatric incident
limited equipment failure or data recovery
small-scale legal/PR response
🚨
Major Breach
$7.7M/yr
Significant containment breach or public exposure requiring large-scale emergency response, settlements, retrieval operations and major research interruption.
containment breach
public/legal exposure
large-scale medical evacuation or settlement
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Call-answer staff (Memetics-trained scientist/technician) | 6 | [#6] 24/7 coverage requires ~4.2 FTEs; budgeted to 6 staff to allow leave/backups/training. |
| Research Scientist | 2 | [#10] Senior memeticist and neuroscientist within SCP-2922 research team. |
| Research Technician | 2 | [#10] Technical support staff for experiments, instrumentation and implants. |
| Data Analyst / Linguist | 3 | [#21] Analysts to debrief calls and annotate memetic features. |
| Security Officer / MTF Agent | 8 | [#16] Shift coverage (armed/unarmed guards) and site security staff. |
| Site Director / Executive Staff | 1 | [#24] Senior oversight and governance representation for the project. |
| Medical Officer | 1 | [#7, #11] On-site medical oversight and coordination with on-call psychiatric/medical services. |
| Engineer / Maintenance | 1 | [#1, #17] Facilities and equipment maintenance support (HVAC, power, EMI filtering, UPS). |
| Administrative Staff | 1 | [#19, #24] Administrative, scheduling, and administrative support for governance and cover operations. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling moderate confidence in baseline staffing and core infrastructure costs; however memetic/extra-dimensional research, legal settlement exposure and long-term escalation budgets have wide ranges and high uncertainty, reducing overall confidence.