SCP-2985
Safe
~
medium confidence
SCP-2985
Expected annual
$1.8M
One-time setup
$928K
Annual recurring
$1.7M
Personnel
10
Initial capital/setup is estimated at roughly $0.93M, driven by lab buildout, secure vault/fire-suppression, and in-house forensic/memetics equipment. Recurring annual costs are roughly $1.74M driven primarily by specialized staff wages, ongoing monitoring/R&D, legal/cover operations, and contingency/reserve allocations.
One-Time Capital Costs
Total: $928K
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal operational year with no major incidents; routine monitoring, maintenance, and planned R&D spending only.
no incident
scheduled maintenance
planned R&D activity
🚨
Minor Incident
$1.8M/yr
Localized containment incident or temperature/RH excursion, small accidental exposure, or a single painting requiring emergency conservation and legal action.
environmental excursion
single-person exposure
minor public leak / small legal claim
🚨
Major Breach
$2.5M/yr
Significant exposure event or high-profile leak requiring international covert intervention, large legal settlements, extensive remediation, and surge R&D.
public release of cognitohazardous audio
multi-person exposure
international/overseas operation
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#5] Four full-time guards to provide 24/7 coverage (shift rotation and leave coverage). |
| Research Scientist (Art Conservator / Collections Manager) | 1 | [#6] One full-time certified conservator for condition checks, handling and humidity/temperature logging. |
| Research Scientist (Memetics / Cognitive Scientist) | 1 | [#7] One memetics/cognitive researcher to analyze the cognitohazardous audio and supervise safe analysis methods. |
| Field Operative | 3 | [#8] Three undercover field operatives for monitoring POI-2985 and art shows. |
| Analyst | 1 | [#8] One analyst to process field intelligence and market-monitoring outputs. |
Confidence Notes
Notes and item-level ranges are well-documented, enabling a medium-confidence estimate. Remaining uncertainty stems from wide ranges for contingency operations, R&D multi-year budgeting and frequency of overseas/intervention events; assumptions were made about operation frequency and R&D annualization.